Operation Results of KSTAR Integrated Control System for First Plasma

نویسنده

  • Mikyung Park
چکیده

After the successful accomplishment of vacuum commissioning assisted by vacuum vessel baking and glow discharge cleaning, KSTAR had shifted to the cool-down phase in April 2, 2008 and completed cooling of all superconducting coils and structures down to the operation temperature of 4.5K for about a month by the helium refrigerator system with 9KW cooling capacity. For the next a month, all superconducting coils were tested individually and conjunctively to investigate the controllability of coil current and field configuration for plasma discharge. Finally, we achieved the plasma with the current up to 130mA and pulse width over 800msec. For the surveillance and operation of KSTAR for Day-I campaign, 11 plant measurement & control systems were implemented, and also diagnostic DAQ systems for gathering the plasma physics data. Furthermore, machine interlock system and personal safety system worked to prevent KSTAR from serious damages and to protect personnel from hazardous events, respectively. The peculiar feature of KSTAR integrated control system is to has introduced EPICS(Experimental Physics and Industrial Control System) as the middleware to integrate whole above heterogeneous local control systems. Therefore, it was highly demanded to verify the adaptability of EPICS and the performance of our control system to meet the requirements of Tokamak operation in the continuous plant operation and the pulse-related experiment. Throughout the Day-I operation, the KSTAR integrated control system thoroughly demonstrated its reliable and eminent performance in not only the plant operation but the discharge control.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Commissioning Results of the KSTAR Superconducting Magnet System for the First Plasma Operation

The KSTAR device is a tokamak with a fully superconducting (SC) magnet system, which enables an advanced quasi-steady-state operation. Initial operation of the KSTAR SC magnet system has been accomplished for the first plasma discharge operation. The SC magnet system consists of 16 toroidal field (TF) coils and 14 PF coils, magnetic structures, SC buslines, current leads, and monitoring and pro...

متن کامل

New Development of Epics-based Data Acquisition System for Millimeter-wave Interferometer in Kstar Tokamak

After successful achievement of the first plasma in 2008, Korea Superconducting Tokamak Advanced Research (KSTAR) has performed the 4 campaign in 2011. During the campaigns, many diagnostic devices have been installed for measuring the various plasma properties in the KSTAR tokamak. From the first campaign, a data acquisition (DAQ) system of Millimeter-wave interferometer (MMWI) has been operat...

متن کامل

Commissioning Results of the KSTAR Neutral Beam System

The neutral beam injection (NBI) system is designed to provide the ion heating and current drive for the high performance operation and long pulse operation of the Korean Superconducting Tokamak Advanced Research (KSTAR). The KSTAR NBI consists of two beam lines. Each beam line contains three ion sources of which one ion source has been designed to deliver more than 2.5 MW of deuterium neutral ...

متن کامل

Diii-d Integrated Plasma Control Tools Applied to next Generation Tokamaks

A complete software suite for integrated tokamak plasma control has been developed within the DIII-D program. The suite consists of software for real-time control of all aspects of the plasma, modeling, simulation and design tools for analysis and development of controllers, a flexible and modular architecture for implementation and testing of algorithms and many fully validated models. Many el...

متن کامل

Overview of Recent Commissioning Results of KSTAR

KSTAR is an advanced tokamak with fully superconducting coils for the steady state plasma research. The detailed engineering design and infrastructure setup for R & D have been completed in 2001. In March 2008, after the construction period of seven years, the KSTAR assembly has been completed, by connecting the cryogenic transfer lines between the tokamak and the cryogenic distribution system....

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008