This contribution will present the role of beam diagnostics in facing the challenges posed by running the LHC close to its design energy of 7TeV. Machine protection will be ever more critical, with the quench level of the magnets significantly reduced, so relying heavily on the beam loss system, abort gap monitor, interlocks on the beam position and fast beam current change system. Non-invasive profile monitoring also becomes more of a challenge, with standard synchrotron light imaging limited by diffraction and rest gas ionisation monitoring dominated by space charge effects. There is also a requirement to better understand beam instabilities, of which several were observed during Run I, leading to the need for synchronised bunch-by-bunch, turn-by-turn information from many distributed instrumentation systems. All of these challenges will be discussed along with the strategies adopted to overcome them.
منابع مشابه
Beam Instrumentation and Diagnostics for the LHC Upgrade
The extensive array of beam instrumentation with which the LHC is equipped, has played a major role in its commissioning, rapid intensity ramp-up and safe and reliable operation. High Luminosity LHC (HL-LHC) brings with it a number of new challenges in terms of beam instrumentation that will be discussed in this chapter. The beam loss system will need significant upgrades in order to be able to...
متن کاملLhc Beam Stability and Performance of the Q/q’ Diagnostic Instrumentation
The BBQ tune (Q) and chromaticity (Q’) diagnostic systems played a crucial role during the LHC commissioning while establishing circulating beam and first ramps. Early on, they allowed to identify issues such as residual tune stability, beam spectrum interferences and beam-beam effects – all of which may impact beam life-times and thus are being addressed in view of nominal LHC operation. This ...
متن کاملCommissioning and First Performance of the Lhc Beam Instrumentation
This paper will outline the progress with LHC commissioning to date, detailing the performance achieved with all the main LHC beam instrumentation systems. It will include an overview of the beam loss system and its role in machine protection, along with that of the beam position system and its use for automatic orbit control. Results will be shown from the highly sensitive base band tune syste...
متن کاملThe LHC as a Nucleus-Nucleus Collider
This paper begins with a summary of the status of the Large Hadron Collider at CERN, including the lead-ion injector chain and the plans for the first phases of commissioning and operation with colliding proton beams. In a later phase, the LHC will collide lead nuclei at centre-of-mass energies of 5.5 TeV per colliding nucleon pair. This leap to 28 times beyond what is presently accessible will...
متن کاملLow Energy Demonstration Accelerator (leda) Beam Instrumentation: Rfq-accelerated Beam Results
Beam diagnostic instrumentation is being developed for the LEDA, a 6.7-MeV, 100-mA-cw proton accelerator, presently being commissioned at the Los Alamos National Laboratory (LANL). This instrumentation will be the basis for much of the Accelerator Production of Tritium and the Spallation Neutron Source linac. Located in the LEDA injector and the high energy beam transport (HEBT) this initial in...