Where Do We Stand with Fuzzy Project Scheduling?

نویسندگان

  • Pierre Bonnal
  • Didier Gourc
  • Germain Lacoste
چکیده

Fuzzy project scheduling has interested several researchers in the past two decades; about 20 articles have been written on this issue. Contrary to stochastic project-scheduling approaches that are used by many project schedulers, and even if the axiomatic associated to the theory of probabilities is not always compatible with decision-making situations, fuzzy project-scheduling approaches that are most suited to these situations have been kept in the academic sphere. This paper starts by recalling the differences one can observe between uncertainty and imprecision. Then most of the published research works that have been done in this field are summarized. Finally, a framework for addressing the resource-constrained fuzzy project-scheduling problem is proposed. This framework uses temporal linguistic descriptors, which might become very interesting features to the project-scheduling practitioners. DOI: 10.1061/!ASCE"0733-9364!2004"130:1!114" CE Database subject headings: Scheduling; Project management; Fuzzy sets.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition

In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...

متن کامل

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

متن کامل

A Project Scheduling Method Based on Fuzzy Theory

In this paper a new method based on fuzzy theory is developed to solve the project scheduling problem under fuzzy environment. Assuming that the duration of activities are trapezoidal fuzzy numbers (TFN), in this method we compute several project characteristics such as earliest times, latest times, and, slack times in term of TFN. In this method, we introduce a new approach which we call modif...

متن کامل

The preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach

Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017