Case Study: Revised Engineering and Testing Practices Resulting From Migration to IEC 61850
نویسندگان
چکیده
Replacing hardwired connections with digital communications over Ethernet requires new engineering and testing practices. PPL Electric Utilities Corporation (PPL) recently designed, installed, and tested a new high-voltage substation using next-generation relay and control equipment. This next-generation substation (NGS) is based on networked Ethernet intelligent electronic devices (IEDs) communicating via IEC 61850. This paper discusses the new technical design details of networking IEDs over Ethernet, but also, and more importantly, it discusses how engineering, installation, and testing practices had to change to accommodate the new technology. PPL methodically replaced their previous protection and control design with a design that provides more functionality while migrating to IEC 61850 communications from multiple IED vendors. In the end, over 50 percent of the hardware, 60 percent of the hardwired connections, many disparate programmable devices, and several software programs were eliminated. New testing techniques were developed to test IEC 61850 communications, and wiring drawings were replaced with GOOSE messaging tables so that test technicians could identify the endpoints of the “virtual” wires. The NGS implementation required completely new communication design methods, IED configuration, verification testing, and system commissioning. This paper describes PPL’s process of developing best engineering practices for substation protection, integration, control, monitoring, metering, and testing. A discussion of these engineering practices and how they evolved provides valuable insight to engineers considering using one or more of the IEC 61850 protocols for peer-to-peer protection and automation or client/server methods for integration and automation. Lessons learned were associated not only with new technology but also with new procedures, such as how test technicians selectively block signals that communicate over Ethernet without physically disconnecting the IED from the network. The paper also discusses PPL’s creation of a project team consisting of representatives from engineering, operations, standards, and relay testing to collectively resolve concerns associated with system testing, future expansion, and maintenance of this design.
منابع مشابه
Real Time Simulation Testing Using IEC 61850
-As IEC 61850 becomes more widely accepted in the electrical engineering community, it is important that the testing tools keep pace with this development. IEC 61850 presents new challenges to real time simulation and closed-loop testing of protective relays. Electrical interfaces used for binary signaling and voltage/current amplifiers must be replaced by an Ethernet connection and an IEC 6185...
متن کاملComparative Reliability Analysis of Substation Automation Architecture Based on IEC 61850 Standard
Using IEC 61850 standard would increase the reliability and availability of electricity network and put a huge impact on network automation. Even though much research works has been done in substation system reliability, there is a few works in automated substation control system reliability. This paper evaluates the reliability of substation automation system based IEC 61850 comparatively cons...
متن کاملA Close-Loop Conformance Testing System of IEC 61850
—With the development of intelligent substation in China, it becoming more important that the conformance testing of IEC 61850 is used to guarantee the interoperability between intelligent electric devices. In view of the current intelligent substation IEC 61850 conformance testing did not form a closed loop, which led to the lacking of comprehensiveness and integrity, a closed-loop conformanc...
متن کاملEfficient maintenance testing in digital substations based on IEC 61850 edition 2
Digital substations are mostly important in the future of the electric power industry which makes their testing a critical process to ensure the required reliability and security of the grid. The paper introduces the definition of a digital substation and efficient testing, as well as the requirements for isolation during testing. It later describes testing related features in IEC 61850 Edition...
متن کاملIEC 61850: Role of Conformance Testing in Successful Integration
The IEC 61850 Standard, Communications Networks and Systems in Substations, provides an internationally recognized method of local and wide area data communications for substation and system-wide protective relaying, integration, control, monitoring, metering, and testing. It has built-in capability for high-speed control and data sharing over the communications network, eliminating most dedica...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2008