Parallel Optimisation of Pump Schedules with a Thread-safe Variant of Epanet Toolkit

نویسندگان

  • M. López-Ibáñez
  • D. T. Prasad
  • B. Paechter
چکیده

The optimisation of pump operations in water distribution networks is an ongoing research topic motivated by the great energy savings that a careful scheduling of pumps may achieve. State-of-the-art approaches often combine an optimisation algorithm, such as Evolutionary Algorithms, and full hydraulic simulation. Despite the advances in optimisation techniques and hardware performance, the time required to obtain a near-optimal schedule is still measured in hours. Multiple CPUs are increasingly used to parallelise tasks that require a high computation time. In fact, parallel optimisation algorithms are widely present in the literature. On the other hand, hydraulic simulators that support parallel computation are scarce. The most popular research simulator, EPANET, was not designed with concurrency in mind. In this paper, a new thread-safe variant of the EPANET Toolkit is proposed. As an application example, we propose a parallel variant of an Ant Colony Optimisation (ACO) algorithm for optimal pump scheduling in water distribution networks.. The thread-safe EPANET library is combined with the parallel ACO algorithm to achieve reduced computation time in a multi-core computer. Experimental results show that an initial computation time close to 2 hours may be reduced to less than half an hour without sacrificing the quality of the results. The number of ants is also identified as a parameter that influences execution time in the parallel ACO approach proposed in this paper.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

CWSNet: An object-oriented toolkit for water distribution system simulations

In the field of water distribution systems the EPANET 2 toolkit is considered nowadays the industry standard for hydraulic modelling. Unfortunately, the design and programming model of EPANET 2 have some limitations that make any attempt to extend its hydraulic solver, add new functionalities or improve performance difficult to achieve and time consuming. A new software toolkit for water distri...

متن کامل

Thread Pitch Variant in Orthodontic Mini-screws: A 3-D Finite Element Analysis

Orthodontic miniscrews are widely used as temporary anchorage devices to facilitate orthodontic movements. Miniscrew loosening is a common problem, which usually occurs during the first two weeks of treatment. Macrodesign can affect the stability of a miniscrew by changing its diameter, length, thread pitch, thread shape, tapering angle and so on. In this study, a 3-D finite element analysis wa...

متن کامل

Operational Optimisation of Water Distribution Networks

Water distribution networks are a fundamental part of any modern city and their daily operations constitute a significant expenditure in terms of energy and maintenance costs. Careful scheduling of pump operations may lead to significant energy savings and prevent wear and tear. By means of computer simulation, an optimal schedule of pumps can be found by an optimisation algorithm. The subject ...

متن کامل

Using Jumping Particle Swarm Optimization for Optimal Operation of Pump in Water Distribution Networks

Carefully scheduling the operations of pumps can be resulted to significant energy savings. Schedules can be defined either implicit, in terms of other elements of the network such as tank levels, or explicit by specifying the time during which each pump is on/off. In this study, two new explicit representations based on timecontrolled triggers were analyzed, where the maximum number of pump sw...

متن کامل

Waterhammer Caused by Intermittent Pump Failure in Pipe Systems Including Parallel Pump Groups

The use of pumps linked in parallel or series in large scale pipe systems is usually inevitable, to meet the required head and discharge. Transient flow occurs following a pump failure in a pump group as a result of variations in the flow rate. This research is an investigation about waterhammer caused by one or more pump-switch off in a pump group when they are connected in parallel. The opera...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008