A New Algorithm for Determining Ultimate Pit Limits Based on Network Optimization

Abstract

One of the main concerns of the mining industry is to determine ultimate pit limits. Final pit is a collection of blocks, which can be removed with maximum profit while following restrictions on the slope of the mine’s walls. The size, location and final shape of an open-pit are very important in designing the location of waste dumps, stockpiles, processing plants, access roads and other surface facilities as well as in developing a production program. There are numerous methods for designing ultimate pit limits. Some of these methods, such as floating cone algorithm, are heuristic and do not guarantee to generate optimum pit limits. Other methods, like Lerchs–Grossmann algorithm, are rigorous and always generate the true optimum pit limits. In this paper, a new rigorous algorithm is introduced. The main logic in this method is that only positive blocks, which can pay costs of their overlying non-positive blocks, are able to appear in the final pit. Those costs may be paid either by positive block itself or jointly with other positive blocks, which have the same overlying negative blocks. This logic is formulated using a network model as a Linear Programming (LP) problem. This algorithm can be applied to two- and three-dimension block models. Since there are many commercial programs available for solving LP problems, pit limits in large block models can be determined easily by using this method.

Similar items

  • a new algorithm for determining ultimate pit limits based on network optimization

    Article2013int. journal of mining & geo-engineeringali asghar khodayari

    one of the main concerns of the mining industry is to determine ultimate pit limits. final pit is a collection of blocks, which can be removed with maximum profit while following restrictions on the slope of the mine’s walls. the size, location and final shape of an open-pit are

  • Dynamic Pit Tracker: An Iterative Heuristic Algorithm Tracing Optimized Solution for Ultimate Pit Limit and Blocks Sequencing Problem

    Article2024Journal of Mining and EnvironmentMeisam Saleki, Reza Khaloo Kakaie, Mohammad Ataei, Ali Nouri Qarahasanlou

    One of the most critical designs in open-pit mining is the ultimate pit limit (UPL). The UPL is frequently computed initially through profit-maximizing algorithms like the Lerchs-Grossman (LG). Then, in order to optimize net present value (NPV), production planning is executed fo

  • Ultimate Pit Limit Optimization using Boykov-Kolmogorov Maximum Flow Algorithm

    Article2021Journal of Mining and EnvironmentA. Mwangi, Z. Jianhua, H. Gang, R. Kasomo

    The ultimate pit limit optimization (UPLO) serves as an important step in the mine planning process. Various approaches of maximum flow algorithms such as pseudo-flow and push-relabel have been used for pit optimization, and have given good results. The Boykov-Kolmogorov (BK) max

  • Highest-Level Implementation of Push–Relabel Algorithm to Solve Ultimate Pit Limit Problem

    Article2021Journal of Mining and EnvironmentM. Talaei, A. Mousavi, A. R. Sayadi

    Nowadays due to the existence of the economic and geological uncertainties and the increasing use of scenario-based project evaluation in the design of open-pit mines, it is necessary to find an exact algorithm that can determine the ultimate pit limit in a short period of time.

  • Determination of Ultimate Pit Limits in Open Mines Using Real Option Approach

    Article2008International Journal of Industrial Engineering and Productional Research-A.D. Akbari, M. Osanloo, M.A. Shirazi

    Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design p

  • Determination of Ultimate Pit Limits in Open Mines Using Real Option Approach

    Scholarly record2010A. D. Akbari, M. Osanloo, M. A. Shirazi

    Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design p