Article

An Integrated Risk-Based Technique for Project Plan Selection

Abstract

Selecting an effective project plan is a significant area in the project management. The present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. The efficient frontier includes two criteria: the project cost and the project time. Besides, the paper presents a scheme to incorporate Directed Acyclic Graph (DAG) into the project risk analysis. This scheme is used to estimate the expected impacts of the occurrence of the project risks on the project cost and the project time. Also, a theoretical model is defined to provide integration between project risk analysis and overall project planning using the breakdown structures. We believe that applying the proposed technique helps the company’s managers in most effective manner dealing with his complicated project plan assessment and selection problems. The application of the technique was implemented in the companies in construction industry in which represented a considerable cost and time improvements.

Similar items

  • an integrated risk-based technique for project plan selection

    Articleinternational journal of industrial engineering and productional research-s.m. mohammad seyedhoseini, m. ali hatefi

    selecting an effective project plan is a significant area in the project management. the present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. the efficient frontier includes t

  • Proposal for an Integrated Case Based Project Planning

    Scholarly record2011CSDMThierry Coudert, Élise Vareilles, Laurent Geneste, Michel Aldanondo

    In previous works [14], models and processes enabling to make interacting a project planning process with the system design one have been presented. Based on the idea that planning and design processes can be guided by consulting past experiences, an integrated case-based approac

  • Managing Underperformance Risk in Project Portfolio Selection

    Scholarly record2015Operations ResearchNicholas G. Hall, Daniel Zhuoyu Long, Jin Qi, Melvyn Sim

    We consider a project selection problem where each project has an uncertain return with partially characterized probability distribution. The decision maker selects a feasible subset of projects so that the risk of the portfolio return not meeting a specified target is minimized.

  • Integrating Risk Reduction, Urban Planning and Housing: Lessons from El Salvador

    Scholarly record2006Christine Wamsler

    as/4322442.stm, accessed 8 October 2005, and http://www.iht.com/articles/2005/10/08/america/web.flood .php, accessed 9 October 2005. 2 See, for instance, http://socsci.colorado.edu/~parisr/PARIS_centamerica_Aug 2002.pdf or http://www.mongabay.com/reference/country_studies/el-salv

  • Integrating Risk Reduction, Urban Planning and Housing: Lessons From El Salvador

    Open-access article2006Open House InternationalChristineWamsler
  • Estimation of Downside Risks in Project Portfolio Selection

    Open-access article2017Production and Operations ManagementJanneKettunen, AhtiSalo