نتایج جستجو برای: Flexible flow shop scheduling

تعداد نتایج: 657574  

Journal: :Computers & OR 1996
John K. Karlof Wei Wang

A two level branch and bound algorithm is developed to solve an altered form of the standard flow-shop scheduling problem modeled as a bilevel programming problem. The flow-shop scheduling problem considered here differs from the standard problem in that operators are assigned to the machines and each operator has a different time table for the jobs on each machine. The shop owner is considered...

2013
Karin Thörnblad Ann-Brith Strömberg Michael Patriksson Torgny Almgren

Purpose To investigate the efficiency of a discretization procedure utilizing a time-indexed mathematical optimization model for finding accurate solutions to flexible job shop scheduling problems considering objectives comprising makespan and tardiness, respectively. Design/methodology/approach A time-indexed mixed integer programming model is used to find solutions by iteratively employing ti...

2010
Chaoyong Zhang Xiaojuan Wang Liang Gao

Flexible job shop scheduling problem (FJSP) is an extended traditional job shop scheduling problem, which more approximates to real scheduling problems. This paper presents a multi-objective genetic algorithm (GA) based on immune and entropy principle to solve the multi-objective FJSP. In this improved multi-objective GA, the immune and entropy principle is used to keep the diversity of individ...

1998
John B. Chambers Wesley Barnes

In the classical job shop scheduling problem (JSSP), n jobs are processed to completion on m unrelated machines. Each job requires processing on each machine exactly once. For each job, technology constraints specify a complete, distinct routing which is fixed and known in advance. Processing times are sequence-independent, fixed, and known in advance. Each machine is continuously available fro...

2012
M. Fikret Ercan

Multiprocessor task scheduling is a generalized form of classical machine scheduling where a task is processed by more than one processor. It is a challenging problem encountered in wide range of applications and it is vastly studied in the scheduling literature (see for instance (Chan & Lee, 1999 and Drozdowski, 1996) for a comprehensive introduction on this topic). However, Drozdowski (1996) ...

Journal: :JORS 2011
J. Jackman Z. Guerra de Castillo S. Ólafsson

XII

2013
Ahmad Afsari

The recent manufacturing environment is characterized as having diverse products due to mass customization, short production lead-time, and unstable customer demand. Today, the need for flexibility, quick responsiveness, and robustness to system uncertainties in production scheduling decisions has increased significantly. In traditional job shops, tooling is usually assumed as a fixed resource....

Journal: :J. Scheduling 2011
Peter Brucker Natalia V. Shakhlevich

We study an inverse counterpart of the two machine flow-shop scheduling problem that arises in the context of inverse optimization. While in the forward scheduling problem all parameters are given and the objective is to find job sequence(s) for which the value of the makespan is minimum, in the inverse scheduling the exact values of processing times are unknown and they should be selected with...

1997
Thomas Stützle

In this article we present an Ant Colony Optimization approach to the Flow Shop Problem. ACO is a new algorithmic approach, inspired by the foraging behavior of real ants, that can be applied to the solution of combinatorial optimization problems. Artificial ants are used to construct solutions for Flow Shop Problems that subsequently are improved by a local search procedure. Comparisons with o...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید