نتایج جستجو برای: Multi-mode demand

تعداد نتایج: 808116  

Journal: :Review of Scientific Instruments 2019

Journal: :The European Physical Journal D 2017

Journal: :International Journal of Quality & Reliability Management 2000

Journal: :Computers & Industrial Engineering 2022

• Developed multi-objective optimisation model for sustainable CLSC network problem. Considered SCs complexity, price-sensitive demand and consumer’s incentives. Data collected from a leading European household appliance company was used. Evidenced the positive effects of incentive pricing on returned goods. Provided multiple trade-off solutions decision makers. Closed-loop supply chains (CLSCs...

Journal: :Sustainability 2021

The 20,000-student Boise State University campus is located about 3 km from the center of city Boise. There a significant amount travel between and as students staff to visit restaurants, shops, entertainment centers. Currently, people make this trip by car, shuttle bus, bike, or walking modes. Cars buses, which share same road network, constitute 76% total trips. As congestion expected grow in...

Journal: :Actuators 2023

A multi-functional, three-mode, self-exciting pneumatic vibroactuator was investigated. The special feature of this is that it consists two excitation chambers connected by an elastic synchronizing chain. mathematical model the created, which solved numerical methods. laws (modes) movement working organ have been determined: harmonic, non-harmonic, and pulsating. results experimental research a...

2002
Harry Groenevelt Nils Rudi Sigrid Lise Non̊as Asmund Olstad Michal Tzur

This article studies a situation where a firm outsources production to a distant manufacturer. The firm has two possible freight modes; a slow mode and a fast but more expensive mode. We formulate a dynamic model and use it to analyze how the firm can combine these two freight modes to enjoy the lower cost of the slow mode while using the fast mode as a hedge against cases in which the demand d...

Journal: :journal of optimization in industrial engineering 0
javad hasanpour quchan university of advanced technology mohammad ghodoosi university of torbat-e heydarieh zahra sadat hosseini k.n. toosi university of technology

the aim of a multi-mode resource-constrained project scheduling problem (mrcpsp) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). these goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید