This paper presents a multi-mode resource-constrained project scheduling problem (MRCPSP) with maximizing the net present value (NPV) form the project contractor’s point of view. Positive and negative cash flows are considered in this model. Furthermore, to make the model close to the real situations, four different models for positive cash flows are considered. Two meta-heuristics, called simu...

2014
F. Villafañez A. Lopez-Paredes J. Pajares

In this paper we review different approaches for scheduling projects in multi-project environments. We show the evolution of the methodologies from the Resource Constrained Project Scheduling Problem to the Decentralized Resource Constrained Multi-Project Scheduling Problem. We argue that traditional methods used in project scheduling cannot cope with the complexity of current real portfolios p...

Journal: :مهندسی صنایع 0
یعقوب قلی پور 1 school of civil engineering mohammad mehdi shahbazi engineering optimization research group

during the implementation, construction projects usually encounter situation that considerably affects the project scheduling and cost. this study aims at using an improved version of the harmony search algorithm (hsa) to schedule resource constrained construction projects. this model is formulated as a global optimization problem. it will determine the duration of each activity to minimize the...

2014

This research proposes a preemptive fuzzy goal programming model for multi-objective multi-mode resource constrained project scheduling problem. The objectives of the problem are minimization of the total time and the total cost of the project. Objective in a multi-mode resource-constrained project scheduling problem is often a minimization of makespan. However, both time and cost should be con...

Journal: :مهندسی عمران فردوسی 0
محمد حسن سبط محمدرضا افشار یعقوب علیپوری

in this paper, a fully informed particle swarm (fips) algorithm is proposed for solving the multi-mode resource-constrained project scheduling problem (mrcpsp) with minimization of project makespan as the objective subject to resource and precedence constraints. in the proposed fips, a random key and the related mode list (ml) representation scheme are used as encoding schemes and the multi-mod...

In this paper, a preemptive multi-objective multi-mode project scheduling model for resource investment problem is proposed. The first objective function is to minimize the completion time of project (makespan);the second objective function is to minimize the cost of using renewable resources. Non-renewable resources are also considered as parameters in this model. The preemption of activities ...

A. Csébfalvi,

In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...