Discrete Fruit Fly Algorithm for Multi-Objective No-Wait Flow Shop Scheduling Problem
Abstract
No abstract recorded for this item.
No abstract recorded for this item.
In this paper the flow shop scheduling problem with minimizing two criteria simultaneously is consider. Selected criteria are: makespan and the sum of tardiness of jobs. For each separate criteria the problem is strongly NP-hard, which makes it NP-hard as well. There is a number
We address the scheduling problem for a no-wait flow shop to optimize total completion time with release dates. With the tool of asymptotic analysis, we prove that the objective values of two SPTA-based algorithms converge to the optimal value for sufficiently large-sized problem
In industries machine maintenance is used in order to avoid untimely machine fails as well as to improve production effectiveness. This research regards a permutation flow shop scheduling problem with aging and learning effects considering maintenance process. In this study, it i