Discrete Fruit Fly Algorithm for Multi-Objective No-Wait Flow Shop Scheduling Problem
نویسندگان
چکیده
منابع مشابه
Solving Re-entrant No-wait Flow Shop Scheduling Problem
In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...
متن کاملSolving a Multi-Objective No-Wait Flow Shop Problem by a Hybrid Multi-Objective Immune Algorithm
A frequently occurring operational problem is one of processing a given number of jobs (commodities) on a specified number of machines (facilities) referred to by various investigators as scheduling, dispatching, sequencing, or combinations thereof (Gupta and Stafford, 2006). In most manufacturing environments, a set of processes is needed to be serially performed in several stages before a job...
متن کاملAn algorithm for multi-objective job shop scheduling problem
Scheduling for job shop is very important in both fields of production management and combinatorial op-timization. However, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. The combination of several optimization criteria induces additional complexity and new problems. In this paper, we pro...
متن کاملA multi-objective genetic algorithm (MOGA) for hybrid flow shop scheduling problem with assembly operation
Scheduling for a two-stage production system is one of the most common problems in production management. In this production system, a number of products are produced and each product is assembled from a set of parts. The parts are produced in the first stage that is a fabrication stage and then they are assembled in the second stage that usually is an assembly stage. In this article, the first...
متن کاملan algorithm for multi-objective job shop scheduling problem
scheduling for job shop is very important in both fields of production management and combinatorial op-timization. however, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. the combination of several optimization criteria induces additional complexity and new problems. in this paper, we pro...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Modeling and Simulation
سال: 2016
ISSN: 2324-8696,2324-870X
DOI: 10.12677/mos.2016.52002