Determining production level under uncertainty using fuzzy simulation and bootstrap technique, a case study

Authors

  • Armin Jabbarzadeh Industrial Engineering Department, Iran University of Science and Technology, Tehran, Iran
  • Ehsan Jahani Industrial Engineering Department, Iran University of Science and Technology, Tehran, Iran
  • Kamran Shahanaghi Industrial Engineering Department, Iran University of Science and Technology, Tehran, Iran
  • Mohammadreza Hamidi Industrial Engineering Department, Iran University of Science and Technology, Tehran, Iran
  • Zahra Pousti Industrial Engineering Department, Iran University of Science and Technology, Tehran, Iran
Abstract:

In every production plant, it is necessary to have an estimation of production level. Sometimes there are many parameters affective in this estimation. In this paper, it tried to find an appropriate estimation of production level for an industrial factory called Barez in an uncertain environment. We have considered a part of production line, which has different production time for different kind of products, which means both environmental and system uncertainty. To solve the problem we have simulated the line and because of the uncertainty in the times, fuzzy simulation is considered. Required fuzzy numbers are estimated by the use of bootstrap technique. The results are used in production planning process by factory experts and have had satisfying consequences. Opinions of these experts about the efficiency of using this methodology, has been attached.

Download for Free

Sign up for free to access the full text

Already have an account?login

similar resources

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 13  issue 4

pages  -

publication date 2017-12-01

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023