New mathematical modeling for a location–routing–inventory problem in a multi-period closed-loop supply chain in a car industry

نویسندگان

  • A. Baboli DISP Laboratory, INSA-Lyon, University of Lyon, Villeurbanne, France
  • F. Forouzanfar Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran
  • M. Bashiri Department of Industrial Engineering, Faculty of Engineering, Shahed University, Tehran, Iran
  • R. Tavakkoli-Moghaddam School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
  • S. M . Hadji Molana Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran
چکیده مقاله:

This paper studies a location–routing–inventory problem in a multi-period closed-loop supply chain with multiple suppliers, producers, distribution centers, customers, collection centers, recovery, and recycling centers. In this supply chain, centers are multiple levels, a price increase factor is considered for operational costs at centers, inventory and shortage (including lost sales and backlog) are allowed at production centers, arrival time of vehicles of each plant to its dedicated distribution centers and also departure from them are considered, in such a way that the sum of system costs and the sum of maximum time at each level should be minimized. The aforementioned problem is formulated in the form of a bi-objective nonlinear integer programming model. Due to the NP-hard nature of the problem, two meta-heuristics, namely, non-dominated sorting genetic algorithm (NSGA-II) and multi-objective particle swarm optimization (MOPSO), are used in large sizes. In addition, a Taguchi method is used to set the parameters of these algorithms to enhance their performance. To evaluate the efficiency of the proposed algorithms, the results for small-sized problems are compared with the results of the ε-constraint method. Finally, four measuring metrics, namely, the number of Pareto solutions, mean ideal distance, spacing metric, and quality metric, are used to compare NSGA-II and MOPSO.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A new multi-product closed-loop supply chain network design in dairy industry

Nowadays, manufacturers need to satisfy consumer demands in order to compete in the real world. This requires the efficient operation of supply chain planning. On the other hand, increasing worldwide environmental, lack of food resources and social concerns are motivating manufacturers and consumers to implement recycling strategies such as product recovery, waste management, or usage of recycl...

متن کامل

Fuzzy Mathematical Model For A Lot-Sizing Problem In Closed-Loop Supply Chain

The aim of lot sizing problems is to determine the periods where production takes place and the quantities to be produced in order to satisfy the customer demand while minimizing the total cost. Due to its importance on the efficiency of the production and inventory systems, Lot sizing problems are one of the most challenging production planning problems and have been studied for many years wit...

متن کامل

A Bi-objective Mathematical Model for Closed-loop Supply Chain Network Design Problem

In this paper, a bi-objective mixed-integer linear optimization model for Closed-loop Supply Chain Network Design Problem (CLSCND) is developed. The proposed model includes both the forward and reverse directions and includes different types of facilities, namely, manufacturing/remanufacturing centers, warehouses, and disassembly centers. The first objective function tried to minimize the total...

متن کامل

Closed-loop Supply Chain Inventory-location Problem with Spare Parts in a Multi-Modal Repair Condition

In this paper, a closed-loop location-inventory problem for spare parts is presented. The proposed supply chain network includes two echelons, namely (1) distribution centers (DCs) and repairing centers (RCs) and (2) operational bases. Multiple spare parts are distributed among operational bases from distribution centers in the forward supply chain and failed spare parts from operational bases ...

متن کامل

A New Mathematical Model for a Multi-product Supply Chain Network with a Preventive Maintenance Policy

The supply chain network design (SCND) implicates decision-making at a strategic level and makes it possible to create an effective and helpful context for managing. The aim of the network is to minimize the total cost so that customer's demands should be met. Preventive maintenance is pre-determined work performed to a schedule with the aim of preventing the wear and tear or sudden failure of ...

متن کامل

Considering Pricing Problem in a Dynamic and Integrated Design of Sustainable Closed-loop Supply Chain Network

Flexible and dynamic supply chain network design problem has been studied by many researchers during past years. Since integration of short-term and long-term decisions in strategic planning leads to more reliable plans, in this paper a multi-objective model for a sustainable closed-loop supply chain network design problem is proposed. The planning horizon of this model contains multiple strate...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 14  شماره 3

صفحات  -

تاریخ انتشار 2018-09-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023