Project Manager Competency Model based on ANP Method in Construction Projects

نویسندگان

  • Ali Maleki Maleki Department of Social & Economical Engineering Amirkabir University, Tehran ,Iran
  • Kaveh Mohammad Cyrus Department of Social & Economical Engineering Amirkabir University, Tehran, Iran
چکیده مقاله:

Most developed countries have already accepted‘’ Competency’’ as the major factor in making management more competitive, therefore they have discovered the importance of Qualification Models and their application to cause human resources growth. Consequently, their aim is to improve the qualification of their human resources, and to reach this end, considering different ways of assessing competence takes precedence. Correct choice of assessment depends on enough resources, factual support, suitable time and of course high level of coincidence of results in assessment with business aims, so it is possible to say that in order to design a robust model of assessing qualification, we are confronted with a process of decision- making with multiple limitations or a problem of MCDM. In this research, we have used ANP method as one of the new MCDM methods to assess qualification because this method raises the possibility to coordinate the effects of correlation and their reactions and simultaneously takes some systematic correlations under a close scrutiny. In this essay, by the help of these methods, we have presented a model that according to it the most significant qualifications of a construction manager has been classified and the most fundamental of them has been detected in order to find the best manager

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

project manager competency model based on anp method in construction projects

most developed countries have already accepted ‘competency’ as the major factor in making management more competitive, therefore they have discovered the importance of qualification models and their application to cause human resources growth. consequently, their aim is to improve the qualification of their human resources, and to reach this end, considering different ways of assessing competen...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

Effect of project characteristics on project performance in construction projects based on structural equation model

Most past studies that analyze project performance and the characteristics that affect such performance consist of a simple form, in which they present the brief relationship between project performance and a few characteristics that affect it. Furthermore, due to the limitations of the research methodologies used in these studies, important characteristics were often not considered in developi...

متن کامل

Identifying and evaluating individual factors of project manager contributing to project success in project-based organizations

In recent years, The importance key success factors  has led organizations to focus more on these factors. project management is one of the factors greatly affecting project success. Having a qualified and competent project manager is the first step to actual project success. In this study, the individual factors and important competencies of the project manager have been investigated. The sta...

متن کامل

A MATHEMATICAL MODEL FOR SELECTING THE PROJECT RISK RESPONSES IN CONSTRUCTION PROJECTS

Risks are natural and inherent characteristics of major projects. Risks are usually considered independently in analysis of risk responses. However, most risks are dependent on each other and independent risks are rare in the real world. This paper proposes a model for proper risk response selection from the responses portfolio with the purpose of optimization of defined criteria for projects. ...

متن کامل

Developing a fuzzy group decision making approach for project manager selection considering the static complexity of construction projects

Due to the particular importance of projects in human life and in organizations, proper project management has been always regarded highly by researchers and practitioners. Recent advances in technology and fundamental changes in most scientific areas have affected projects and made their nature and environmental circumstances much more complex than in the past. Fortunately, in recent years, ma...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 3  شماره 2

صفحات  25- 38

تاریخ انتشار 2015-06-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

کلمات کلیدی

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023