A. Parhizkar

Department of Mining Engineering, Islamic Azad University, Lahijan Branch, Lahijan, Iran

[ 1 ] - Use of a mixed integer programming model to achieve an optimum size of blast block in open-pit mining with regard to size of mineable block using fuzzy logic approach

In this paper, we present an integrated model to find the optimum size of blast block that uses (i) a multi-criteria decision-making method to specify the applicable size of the mineable block; (ii) a linear programming method for the selection of the blasted areas to be excavated and in deciding the quantity of ores and wastes to be mined from each one of the selected blocks. These two methods...

نویسندگان همکار