The General Scheduling Problem (GSP) generalizes scheduling problems with sum of cost objectives such as weighted flow time and weighted tardiness. Given a set of jobs with processing times, release dates, and job dependent cost functions, we seek to find a minimum cost preemptive schedule on a single machine. The best known algorithm for this problem and also for weighted flow time/tardiness i...
The unrelated parallel machine scheduling (PMS) problem is essential for the manufacturing industry. Scheduling will save company resources, especially time management. By solving problems quickly and precisely, can get more profit. On that note, this paper focused on PMS problems, which did not consider inherent uncertainty in processing set up by minimizing makespan tardiness. This aimed to m...
This study investigates the single-machine scheduling problem with common due-win -dow assignment, past-sequence-dependent (p-s-d) setup times and a deteriorating maintenance activity. By past-sequence-dependent setup times, we mean that the setup time of a job is proportional to the sum of the processing times of the jobs already processed. The objective is to minimize a cost function based on...
We consider uniform parallel machine scheduling problems with unit-length jobs where every job is only allowed to be processed on a specified subset of machines. We develop efficient methods to solve problems with various objectives, including minimizing a total tardiness function, a maximum tardiness function, total completion time, the number of tardy jobs, the makespan, etc.
We consider the problem of scheduling of n jobs to minimize the total earliness and tardiness penalty. The scheduling objective is to minimize the sum of job dependent earliness and tardiness penalties.. After determining the scheduling for single machine common due date, using neural network, the result shows that the neural network solution performs very well.
Most web servers, in practical use, use a queuing policy based on the Best E8ort model, which employs the 9rst-in-9rst-out (FIFO) scheduling rule to prioritize web requests in a single queue. This model does not provide Quality of Service (QoS). In the Di8erentiated Services (Di8Serv) model, separate queues are introduced to di8erentiate QoS for separate web requests with di8erent priorities. T...
This paper considers the problem of minimizing the mean tardiness of N jobs when the jobs are scheduled on a single machine. A simple algorithmic procedure is develop to obtain an optimal or a near optimal sequence for the N jobs while considering an equal penalty cost incurred to each job delivered later than its due date. The developed algorithm is applied to the several test problems. The re...
In this paper, we present the results of a simulation study for the performance evaluation of certain batching strategies in a multi-product semiconductor wafer fabrication facility (waferfab). Batching in waferfabs means that we can process different lots at the same time on the same machine. As opposite to common scheduling and dispatching decisions in manufacturing beside assignment and sequ...
This paper investigates common (slack) due-date assignment single-machine scheduling with controllable processing times within a group technology environment. Under linear and convex resource allocation functions, the cost function minimizes (including weighted sum of earliness, tardiness, assignment, where weights are position-dependent) resource-allocation costs. Given some optimal properties...