نتایج جستجو برای: quadratic earliness and tardiness

تعداد نتایج: 16835768  

2006
You In Choung

This paper considers a scheduling problem for a single burn-in oven in the semiconductor manufacturing industry where the oven is a batch processing machine with restricted capacity. The batch processing time is set by the longest processing time among those of all the jobs contained in the batch. All jobs are assumed to have the same due date. The objective is to minimize the sum of the absolu...

Journal: :International Journal of Production Research 2021

We consider a special class of resource-constrained single machine scheduling problems. In the classical context, resource types are classified into renewable and non-renewable; however, large variety real-world problems may not fit one these classes, e.g. labour regulations in project scheduling, budget allocation to different phases construction project, dose management medical imaging centre...

2007
Pei Chann Chang Shih-Hsin Chen

In this paper, we present a genetic algorithm approach that considers the single machine scheduling problem. There are n jobs, in which each job j ( 1 2 j n = , ,..., ) has a normal processing time j p , a due date j d , earliness penalty j α , and tardiness penalty j β . The objective is to find the sequence of jobs that minimizes the weighted sum of earliness and tardiness penalty costs, with...

Journal: :Discrete Optimization 2009
Yann Hendel Nina Runge Francis Sourd

This paper investigates thenotion of preemption in scheduling,with earliness and tardiness penalties. Starting from the observation that the classical cost model where penalties only depend on completion times does not capture the just-in-time philosophy, we introduce a new model where the earliness costs depend on the start times of the jobs. To solve this problem, we propose an efficient repr...

Journal: :4OR 2012
Adam Janiak Wladyslaw A. Janiak Mikhail Y. Kovalyov Frank Werner

We study problems of scheduling n unit-time jobs on m identical parallel machines, in which a common due window has to be assigned to all jobs. If a job is completed within the due window, then no scheduling cost incurs. Otherwise, a job-dependent earliness or tardiness cost incurs. The job completion times, the due window location and the size are integer valued decision variables. The objecti...

Journal: :Mathematics 2023

Under just-in-time production, this paper studies a single machine common due-window (denoted by CONW) assignment scheduling problem with position-dependent weights and resource allocations. A job’s actual processing time can be determined the assigned to job. allocation model is divided into linear convex models, our goal find an optimal location, job sequence allocation. We prove that weighte...

2001
Koji Nonobe Toshihide Ibaraki

As the resource constrained project scheduling problem (RCPSP) has a wide range of applications, its models, extensions and algorithms have been intensively studied [2]. As for objective functions, makespan minimization has commonly been used, while the importance of non-regular ones such as earliness-tardiness are also recognized. In this paper, we introduce a time-lag cost, which is charged a...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید