PURPOSE A novel end-to-end system using a CCD camera and a scintillator based phantom that is capable of measuring the beam-by-beam delivery accuracy of Robotic Radiosurgery has been developed and reported in our previous work. This work investigates its application to end-to-end type daily QA for Robotic Radiosurgery (Cyberknife) with Variable Aperture Collimator (Iris). METHODS The phantom ...
For the stable high-luminosity operation and luminosity-increase, the electron and positron storage rings of the KEK B-Factory (KEKB) is equipped with various beam instrumentations, which have being working well since the start of the commissioning in December, 1998. Details and performance of the beam-position monitor system based on the spectrum analysis using DSPs, the turn by turn BPM with ...
The EXCYT facility (EXotics with CYclotron and Tandem) at the INFN-LNS is under completion and its commissioning with Li as the first radioactive beam is foreseen by the end of 2004. In the following, we report the work done with an emphasis on the measured yields and production efficiencies for 8, Li
The GSI Unilac was upgraded as a high current injector for the SIS in 1999. Therefore, the stripping section [1] at 1.4 MeV/u, where a beam transport under highest space charge conditions and multi beam operation had to be established, was completely new designed. Results of the commissioning of the stripper section will be presented. The beam transport to the new gas stripper, and the charge s...
BL13-XALOC is currently the only macromolecular crystallography beamline at the 3 GeV ALBA synchrotron near Barcelona, Spain. The optics design is based on an in-vacuum undulator, a Si(111) channel-cut crystal monochromator and a pair of KB mirrors. It allows three main operation modes: a focused configuration, where both mirrors can focus the beam at the sample position to 52 µm × 5.5 µm FWHM ...
The SNS linac utilizes several accelerating structures operating at different frequencies and with different transverse focusing structures. Low-loss beam transport requires careful matching at the transition points for both the transverse and longitudinal plane. Longitudinal beam parameters are measured using four Bunch Shape Monitors (used at many ion accelerator facilities, aka Feschenko dev...
The third-generation synchrotron radiation (SR) facilities are storage ring-based facilities with many insertion devices and photon beamlines, and have low injection beam power, but extremely high stored beam power. The fourth-generation X-ray free electron laser (FEL) facilities are based on an electron Linac with a long undulator and have high injection beam power. Due to its electron and pho...
The Low Energy Ion Ring (LEIR) is a central piece for LHC ion operation at CERN, transforming long Linac3 pulses into high density bunches needed for LHC. The first phase of LEIR commissioning successfully attained its goal of providing the so-called “early ion beam” (one bunch of 2.25 10 Lead ions) needed for the first LHC ion runs with reduced luminosity. Studies in view of generating the bea...
The Front End Enclosure (FEE) of the Linac Coherent Light Source (LCLS) is a shielding housing located between the electron dump area and the first experimental hutch. The upstream part of the FEE hosts the commissioning diagnostics for the FEL beam. In the downstream part of the FEE, two sets of grazing incidence mirror and several collimators are used to direct the beam to one of the experime...
The SPS LSS4 fast extraction system will serve both the anti-clockwise ring of the LHC and the CERN Gran Sasso Neutrino project (CNGS). CNGS requires 2 fast extractions of 10.5 microsecond long batches, 50 milliseconds apart. Each batch will consist of 2.4 × 10 protons at 400 GeV. These intensities are factor of 10 above the equipment damage limit in case of beam loss. Active (interlock system)...