نتایج جستجو برای: machine

تعداد نتایج: 263505  

Journal: :international journal of environmental research 0
i. cinar department of mining engineering, selcuk university, 42079 konya, turkey c. sensogut department of mining engineering, dumlupinar university, 43100 kutahya, turkey

in this study, results of noise level measurements performed in 4 different mining sites aregiven. noise level measurements performed in opencast mining site of konya ilgin lignite corporation (ilc), in konya eyak mining quarry site and in aydin cine feldspar ore dressing facility have been evaluatedtogether with worker surveys. the noise level measurements performed in manisa soma uyar mining ...

Journal: :بین المللی مهندسی صنایع و مدیریت تولید 0
ghasem moslehi professor of industrial engineering – isfahan university of technology kamran kianfar phd student of industrial engineering – isfahan university of technology

nowadays, scheduling problems have a considerable application in production and service systems. in this paper, we consider the scheduling of n jobs on a single machine assuming no machine idleness, non-preemptive jobs and equal process times. in many of previous researches, because of the delivery dalays and holding costs, earliness and tardiness penalties emerge in the form of linear combinat...

Journal: :international journal of environmental research 2013
i. cinar c. sensogut

in this study, results of noise level measurements performed in 4 different mining sites aregiven. noise level measurements performed in opencast mining site of konya ilgin lignite corporation (ilc), in konya eyak mining quarry site and in aydin cine feldspar ore dressing facility have been evaluatedtogether with worker surveys. the noise level measurements performed in manisa soma uyar mining ...

Journal: :journal of quality engineering and production optimization 2015
amir hossein parsamanesh rashed sahraeian

despite existing various integer programming for sequencing problems, there is not enoughinformation about practical values of the models. this paper considers the problem of minimizing maximumlateness with release dates and presents four different mixed integer programming (mip) models to solve thisproblem. these models have been formulated for the classical single machine problem, namely sequ...

Journal: :مهندسی عمران فردوسی 0
علیرضا کردجزی فریدون پویانژاد

bearing capacity prediction of axially loaded piles is one of the most important problems in geotechnical engineering practices, with a wide variety range of methods which have been introduced to forecast it accurately. machine learning methods have been reported by many contemporary researches with some degree of success in modeling geotechnical phenomena. in this study, a fairly new machine l...

Journal: :مهندسی بیوسیستم ایران 0
امین اله معصومی عباس همت علی شهریان

to reduce the storing space and handling costs for hay/straw bales, recompressing the original bales after adequate hay drying is recommended. in this project, a recompression machine was designed, constructed and evaluated. solidwork and nastran software were employed to model, and to analyze the stresses in the components of the machine, respectively. the components of the machine consisted o...

Journal: :کشاورزی (منتشر نمی شود) 0
احمد افضل زاده استادیار گروه علوم دامی، پردیس ابوریحان، دانشگاه تهران، پاکدشت رضا افضل زاده استادیار، گروه فیزیک، دانشکده علوم، دانشگاه صنعتی خواجه نصیرالدین طوسی، تهران محمد قراچمنلو کارشناس ارشد رشته مکانیک، دانشگاه صنعتی خواجه نصیر طوسی، تهران

in nutritional experiments the animals are kept in metabolic cage and are fed according to the planned interval times. a machine was designed and fabricated to feed the sheep every one or two hours. the machine operates with 220 volts electricity and the feed storing capacity is designed for three days feeding. the weight of sheep and type of feed determines the amount of feed required. by chan...

This paper considers identical parallel machines scheduling problem with past-sequence-dependent setup times, deteriorating jobs and learning effects, in which the actual processing time of a job on each machine is given as a function of the processing times of the jobs already processed and its scheduled position on the corresponding machine. In addition, the setup time of a job on each machin...

Moghadaseh Vafaeinezhad Parisa Shahnazari-Shahrezaei Reza Kia

Cell formation (CF) problem is one of the most important decision problems in designing a cellular manufacturing system includes grouping machines into machine cells and parts into part families. Several factors should be considered in a cell formation problem. In this work, robust optimization of a mathematical model of a dynamic cell formation problem integrating CF, production planning and w...

ژورنال: علوم آب و خاک 2003
احمد غضنفری مقدم, ,

In order to increase the role of machine vision in agricultural research in Iran, especially for measuring physical attributes of seeds, a machine vision system was developed using a computer, a capture card, a video camera and a light box. All equipment was purchased from domestic markets. Computer programs were developed for hardware setup and for image processing applications. The programs p...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید