نتایج جستجو برای: open pit mine production planning

تعداد نتایج: 1190554  

2014
Amina Lamghari Roussos Dimitrakopoulos Jacques A Ferland

Uncertainty is an inherent aspect of the open-pit mine production scheduling problem (MPSP); however, little is reported in the literature about solution methods for the stochastic versions of the problem. In this paper, two variants of a variable neighbourhood descent algorithm are proposed for solving the MPSP with metal uncertainty. The proposed methods are tested and compared on actual larg...

Journal: :Riset geologi dan pertambangan 2022

One of the most critical aspects open pit mining is dewatering and mine drainage systems. The NCP Open Pit Gold Mine located in Central Kalimantan. This study area has a range rainfall intensities durations from moderate to heavy. Good required manage runoff water reduce entering front loading. used daily intensity data 1994 2018. Using Mononobe Method, hydrological for this were evaluated by d...

Journal: :JORS 2014
Amina Lamghari Roussos G. Dimitrakopoulos Jacques A. Ferland

Uncertainty is an inherent aspect of the open-pit mine production scheduling problem (MPSP); however, little is reported in the literature about solution methods for the stochastic versions of the problem. In this paper, two variants of a variable neighbourhood descent algorithm are proposed for solving the MPSP with metal uncertainty. The proposed methods are tested and compared on actual larg...

2011
John Meech Juliana Parreira

Driverless haulage trucks have recently been developed for open pit mines. To predict the benefits of an Autonomous Haulage System (AHS), a deterministic/stochastic model has been created to compare AHS to a manual system by estimating benchmarked Key Performance Indicators (KPIs) such as productivity, safety, breakdown frequencies, maintenance and labor costs, fuel consumption, tire wear, and ...

2011
E. Bakhtavar

In this paper, problem of short-term production planning for dimension stone quarries was mathematically modeled using a binary integer programming. The model includes an objective function, which was founded as the minimization of the costs due to the total cutting planes of the blocks. This objective may cause to maximization of the net present value (NPV) in dimension stone quarries. During ...

Journal: :Journal American Society of Mining and Reclamation 1995

Journal: :The Journal of the Acoustical Society of America 1976

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید