نتایج جستجو برای: uncertain flow shop system
تعداد نتایج: 2667634 فیلتر نتایج به سال:
In this paper an ant colony optimization algorithm is developed to solve the permutation flow shop scheduling problem. In the permutation flow shop scheduling problem which has been vastly studied in the literature, there are a set of machines and a set of jobs. All the jobs are processed on all the machines and the sequence of jobs being processed is the same on all the machines. Here this pro...
Lot streaming is a technique used to split the processing of lots into several sublots (transfer batches) to allow the overlapping of operations in a multistage manufacturing systems thereby shortening the production time (makespan). The objective of this paper is to minimize the makespan and total flow time of n-job, m-machine lot streaming problem in a flow shop with equal and variable size s...
This paper deals with performance evaluation and scheduling problems in m machine stochastic flow shop with unlimited buffers. The processing time of each job on each machine is a random variable exponentially distributed with a known rate. We consider permutation flow shop. The objective is to find a job schedule which minimizes the expected makespan. A classification of works about stochastic...
this study considers scheduling in hybrid flow shop environment with unrelated parallel machines for minimizing mean of job's tardiness and mean of job's completion times. this problem does not study in the literature, so far. flexible flow shop environment is applicable in various industries such as wire and spring manufacturing, electronic industries and production lines. after mode...
Smaller production companies, such as job shops, are often incapable of committing significant human or capital resources for the improvement of manufacturing flow times. However, there is considerable demand in these organizations for solutions that offer improvements without the risk involved in expending these resources. This paper investigates the impact of scheduling rules and reorganizati...
We are interested here in new sub cases for which permutation flow shop schedules are dominant while considering the classical flow shop scheduling problem and the makespan criterion. To obtain these sub cases, we introduce conditions on the lower and upper bounds of the processing times. These conditions can be quite realistic when the corresponding line is balanced.
The scheduling literature reveals that majority of the studied problems are for deterministic case where all parameters jobs known in advance and fixed. However, some real-world environments, assumption fixed is not valid since job uncertain. An uncertain parameter can be modelled as a random variable within interval with lower upper bounds, called bounded. objective this paper to review invest...
World-class manufacturing paradigms emerge from specific types of manufacturing systems with which they remain associated until they are obsolete. Since its introduction the lean paradigm is almost exclusively implemented in repetitive manufacturing systems employing flow-shop layout configurations. Due to its inherent complexity and combinatorial nature, scheduling is one application domain wh...
Production planning is performed through diverse methods according to the type of the system it is structured upon. One of the most important steps before production planning is to determine which system best fits the firm, and how the facilities should be designed. Both job-shop and group-technology systems have their own pros and cons, each of which is suitable to a specific kind of factory. ...
Production planning is performed through diverse methods according to the type of the system it is structured upon. One of the most important steps before production planning is to determine which system best fits the firm, and how the facilities should be designed. Both job-shop and group-technology systems have their own cons and pros, each of which is suitable to a specific kind of factory. ...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید