The interdependency of electric and natural gas systems is becoming stronger. challenge how to meet various energy demands in an integrated system (IES) with minimal cost has drawn considerable attention. optimal scheduling IESs ideal method solve this problem. In study, a day-ahead model for IES that included electrical system, hub (EH), was established. proposed EH contained detailed models t...