نتایج جستجو برای: precedence constrained sequencing problem

تعداد نتایج: 1062380  

Journal: :Computers & Operations Research 2022

We consider the so-called periodically aggregated resource-constrained project scheduling problem. This problem, introduced by Morin et al. (2017), is a variant of well-known problem that allows for more flexible usage resource constraints. While start and completion times activities can be arbitrary moments in time, limitations on are considered average over periods parameterized length. paper...

2015
Dusan N. Sormaz

This paper analyzes manufacturing feature interactions and presents algorithms for handling feature interactions in manufacturing process planning. A feature precedence network, which specifies the constraints for the machining sequence, and an AND-OR graph, which describes alternative representations, are built. Application of required/optional volumes, the AND-OR graph, and the feature preced...

Journal: :Discrete Applied Mathematics 2001
Cristina C. B. Cavalcante Cid C. de Souza Martin W. P. Savelsbergh Y. Wang Laurence A. Wolsey

In this paper we consider a labor constrained scheduling problem (LCSP) which is a simplification of a practical problem arising in industry. Jobs are subject to precedence constraints and have specified processing times. Moreover, for each job the labor requirement varies as the job is processed. Given the amount of labor available in each period, the problem is to finish all the jobs as soon ...

2005
Pierre-François Dutot

The model of moldable task (MT) was introduced some years ago and has been proved to be an efficient way for implementing parallel applications. It considers a target application at a larger level of granularity than in other models (corresponding typically to numerical routines) where the tasks can themselves be executed in parallel on any number of processors. Clusters of SMP (symmetric Multi...

2001
Vikram Iyengar Krishnendu Chakrabarty

Test scheduling is a major problem in system-on-a-chip (SOC) test automation. We present an integrated framework that addresses several important test scheduling problems. We first present efficient techniques to determine optimal SOC test schedules with precedence constraints, i.e., schedules that preserve desirable orderings among tests. We then present a new algorithm that uses preemption to...

1996
Andreas Drexl

Over the years numerous branch-and-bound procedures for solving the resource-constrained project scheduling problem have been developed. Enumerating delaying alternatives, extension alternatives, feasible posets, feasible sequences or feasible subsets, they all aim at nding as fast as possible a makespan minimal schedule among the resource and precedence feasible ones. The enumeration is oftenl...

1997
J. Ramanujam

This paper presents new results on lower bounds for the scheduling problem in high-level synthesis. While several techniques exist for lower bound estimation, comparisons among the techniques have been experimental with few guarantees on the quality of the bounds. In this paper, we present new bounds and a theoretical comparison of these with existing bounds. For the resource-constrained schedu...

Journal: :Computers & OR 2008
Ningxiong Xu Sally A. McKee Linda K. Nozick Ruke Ufomata

The key question addressed by the resource-constrained project scheduling problem (RCPSP) is to determine the start times for each activity such that precedence and resource constraints are satisfiedwhile achieving some objective. Priority rule-based heuristics are widely used for large problems. Rollout and justification can be integrated with priority rule heuristics to solve the RCPSP. We de...

1998
M. Baioletti S. Marcugini A. Milani

This paper presents a technique for encoding the representation of a constrained planning problem through the generation of an equivalent unconstrained planning problem. In many real situations the initial state/goals characterization of a planning problem is not satisfactory, this motivates the notion of a constrained planning problem, i.e. a planning problem for which the user speciies additi...

2015
Rui Moutinho Anabela Tereso

We explore the finish-to-start precedence relations of project activities used in scheduling problems. From these relations, we devise a method to identify groups of activities that could execute concurrently, i.e. activities in the same group can all execute in parallel. The method derives a new set of relations to describe the concurrency. Then, it is represented by an undirected graph and th...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید