نتایج جستجو برای: tunnel boring machines

تعداد نتایج: 97937  

Successful application of a TBM in a project requires investigating both the ground conditions and the machine and backup system design features. Prediction of the machine performance is very important as it has a big effect on the duration of the project and the costs. In this respect, both penetration rate and advance rate must be estimated. Utilization factor, which depends on the type of op...

2014
M. Azadi M. Kalhor

Excavation of shallow tunnels such as subways in urban areas plays a significant role as a life line and investigation of the soil behavior against tunnel construction is one of the vital subjects studied in the geotechnical scope. Nowadays, urban tunnels are mostly drilled by T.B.Ms and changing the applied forces to tunnel lining is one of the most risky matters while drilling tunnels by thes...

Journal: :journal of mining and environment 2012
omid frough seyed rahman torabi majid tajik

successful application of a tbm in a project requires investigating both the ground conditions and the machine and backup system design features. prediction of the machine performance is very important as it has a big effect on the duration of the project and the costs. in this respect, both penetration rate and advance rate must be estimated. utilization factor, which depends on the type of op...

Journal: :Machines 2021

The article considers the problems of magnetic field distribution, generated by a power electric cable at micro-tunnel-boring shield arrangement site numerical modeling with further full-scale device model experiment. impact foreign sources on readings three-component sensors was established in process study. considerable existence parasitic noises, conditioned external fields and high sensitiv...

2014

The aim of this work is to use Data Mining tools to develop models for the prediction of hard rock tunnel boring machine (TBM) penetration rate (ROP). A database published by Yagiz (2008) was used to develop these models. The parameters of the database were the uniaxial compressive strength (UCS), an index used to quantify the brittleness and toughness and denominated peak slope index (PSI), th...

H. Fattahi,

key factor in the successful application of a tunnel boring machine (TBM) in tunneling is the ability to develop accurate penetration rate estimates for determining project schedule and costs. Thus establishing a relationship between rock properties and TBM penetration rate can be very helpful in estimation of this vital parameter. However, this parameter cannot be simply predicted since there ...

2009
Show-Shyan Lin Ming-Tsan Chuang Jeong-Lian Wen Yung-Kuang Yang

This study investigated the optimization of computer numerical control (CNC) boring operation parameters for aluminum alloy 6061T6 using the grey relational analysis (GRA) method. Nine experimental runs based on an orthogonal array of Taguchi method were performed. The surface properties of roughness average and roughness maximum as well as the roundness were selected as the quality targets. An...

Journal: :International Journal of Safety and Security Engineering 2020

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید