This study identified the causes of insufficient emergency interconnected operation (EIO) performance, such as pressure-related problems and connection caused by elevation differences between blocks, characteristics locations interconnection pipes (EIPs), pumps. Then, it tested four strategies to improve EIO including increasing EIP diameter or installing additional EIPs, pressure reducing valv...