نتایج جستجو برای: berm seawall

تعداد نتایج: 511  

Journal: :E3S web of conferences 2021

The closure of the reclamation project generally requires that sluice has been built and can be normally opened closed for drainage. There is a large amount follow-up work after closured this project. In order to reach safe flood control standard next typhoon season closure, reduce risk, strive sufficient time subsequent construction seawall, it necessary in advance under condition not yet open...

2004
John R. Barnett Richard C. Warner Dwayne R. Edwards

Control of nonpoint source pollution is essential for improving water quality. The Environmental Protection Agency reports that the three primary pollutants to the nation's waterways are bacteria, nutrients, and sediment. Runoff from grazed pastures and manure applied land often contains high concentrations of fecal coliforms and nutrients. To control and treat this runoff, a low-cost, highly e...

Journal: :Han-gug hae-an hae-yang gonghaghoe nonmunjib 2023

Wave overtopping rate is one of the most important design parameters for coastal structures. In this study, physical model tests measuring wave have been conducted with foreshore slope in front seawall. The bottom seabed road area was fabricated at flume two areas East sea areas. measured various water depths and conditions each area. particular, impulsive were compared previous research simila...

Journal: :Journal of Japan Society of Civil Engineers, Ser. B2 (Coastal Engineering) 2016

Journal: :IOP Conference Series: Earth and Environmental Science 2017

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید