Journal: :J. Scheduling 2012
Alexander V. Kononov Sergey Sevastyanov Maxim Sviridenko

We present a comprehensive complexity analysis of classical shop scheduling problems subject to various combinations of constraints imposed on the processing times of operations, the maximum number of operations per job, the upper bound on schedule length, and the problem type (taking values “open shop”, “job shop”, “mixed shop”). It is shown that in the infinite class of such problems there ex...

Journal: :Discrete Applied Mathematics 1996
Dominique de Werra Alan J. Hoffman Nadimpalli V. R. Mahadev Uri N. Peled

Preemptive open shop scheduling can be viewed as an edge coloring problem in a bipartite multigraph. In some applications, restrictions of colors (in particular preassignments) are made for some edges. We give characterizations of graphs where some special preassignments can be embedded in a minimum coloring (number of colors = maximum degree). The case of restricted colorings of trees is shown...

1989
E. TAILLARD

In this paper, we propose 260 scheduling problems whose size is greater than that of the rare examples published. Such sizes correspond to real dimensions of industrial problems. The types of problems that we propose are : the permutation flow shop, the job shop and the open shop scheduling problems. We restrict us to basic problems : the processing times are fixed, there are neither set-up tim...

Journal: :Computers & Industrial Engineering 2014
Richard Quibell Vitaly A. Strusevich

The paper considers a three-machine shop scheduling problem to minimize the makespan, in which the route of a job should be feasible with respect to a machine precedence digraph with three nodes and one arc. For this NP-hard problem that is related to the classical flow shop and open shop models, we present a simple 1.5approximation algorithm and an improved 1.4-approximation algorithm.

2013
Daniela I. Borissova Ivan C. Mustakerov

The paper addresses a problem of optimal staffing in open shop environment. The problem is to determine the optimal number of operators serving a given number of machines to fulfill the number of independent operations while minimizing staff idle. Using a Gantt chart presentation of the problem it is modeled as twodimensional cutting stock problem. A mixed-integer programming model is used to g...

1995
Weizhen Mao

In the multi-operation scheduling that arises in industrial engineering, each job contains multiple tasks (operations) that require execution in different shops. It is assumed that in each shop there is only one machine to perform the required operations. In this paper, a parallel model of multi-operation scheduling is proposed, in which multiple machines are available in each shop to perform t...

Journal: :international journal of supply and operations management 2014
bahman naderi vahid roshanaei

in some industries as foundries, it is not technically feasible to interrupt a processor between jobs. this restriction gives rise to a scheduling problem called no-idle scheduling. this paper deals with scheduling of no-idle open shops to minimize maximum completion time of jobs, called makespan. the problem is first mathematically formulated by three different mixed integer linear programming...

2009
Pisut Pongchairerks

This research introduces three heuristic algorithms for solving job-shop scheduling problems, job-shop scheduling problems with multi-purpose machines, and open-shop scheduling problems. All these algorithms are based on the particle swarm optimization algorithm, and generate solutions that belong to the class of parameterized active schedules via their specific decoding procedures. Comparison ...

Journal: :Operations Research 1997
David P. Williamson Leslie A. Hall Han Hoogeveen Cor A. J. Hurkens Jan Karel Lenstra Sergey Vasil'evich Sevast'janov David B. Shmoys

We consider the open shop, job shop, and ow shop scheduling problems with integral processing times. We give polynomial-time algorithms to determine if an instance has a schedule of length at most 3, and show that deciding if there is a schedule of length at most 4 is N P-complete. The latter result implies that, unless P = N P, there does not exist a polynomial-time approximation algorithm for...

2007
Jean-Noël Monette Yves Deville Pierre Dupont

The Open-Shop Problem is a hard problem that can be solved using Constraint Programming or Operation Research methods. Existing techniques are efficient at reducing the search tree but they usually do not consider the absolute ordering of the tasks. In this work, we develop a new propagator for the One-Machine Non-Preemptive Problem, the basic constraint for the Open-Shop Problem. This propagat...