نتایج جستجو برای: mine pit lake
تعداد نتایج: 73796 فیلتر نتایج به سال:
In this study, the Lagrange element strength reduction method is used to explore slope stability and as an evaluation of underground mining end-slope coal in a rock-stability analysis. A numerical analysis model established herein using geological conditions for coordinated open pit with area Anjialing Open-Pit Mine Underground No. 2 Mine. Additionally, evolution law open-pit studied proposed s...
To effectively manage the stability of in-pit dumps with an underlying weak layer, a new plan for treatment staged floor during life mine was proposed in this study. Based on direct shear test results, properties contact surfaces between dumped spoil, and mudstone were determined. Taking Baiyinhua No.1 Open-pit Mine as example, surface spoil determined its cohesion to be 25.78 kPa, internal fri...
in the open-pit mining, one of the first decisions that must be made in production planning stage, after completing the design of final pit limits, is determining of the processing plant cut-off grade. since this grade has an essential effect on operations, choosing the optimum cut-off grade is of considerable importance. different goals may be used for determining optimum cut-off grade. one of...
Mercury (Hg) and reproduction and status of Western and Clark's Grebes (Aechmophorus sp.) and Osprey (Pandion haliaetus) were studied from 1992 through 2001 and then less intensely through 2006 at Clear Lake, California, USA. Remediation to reduce Hg loading from the Sulphur Bank Mercury Mine was initiated in 1992. Mercury in grebe feathers declined monotonically from approximately 23 mg/kg dry...
Noise emissions are a significant environmental impact caused by the mining industry in all technological phases of surface mining, mineral processing, and waste disposal. This paper presents role noise assessment control large-scale operations. Mine planning develops model operations, ore excavation, dumping scheduling processing rates, including spatial distribution activities. Such level min...
The open pit mine production scheduling (OPMPS) problem seeks to determine when, if ever, to extract each notional, three-dimensional block of ore and/or waste in a deposit and what to do with each, e.g., send it to a particular processing plant or to the waste dump. This scheduling model maximizes net present value subject to spatial precedence constraints, and resource capacities. Certain min...
For the purpose of production scheduling, open-pit mines are discretized into three-dimensional arrays known as block models. Production scheduling consists of deciding which blocks should be extracted, when they should be extracted, and what to do with the blocks once they are extracted. Blocks that are close to the surface should be extracted first, and capacity constraints limit the producti...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید