Journal: :CoRR 2014
Abhishek Awasthi Jörg Lässig Oliver Kramer

This chapter presents a novel idea for the general case of the Common Due-Date (CDD) scheduling problem. The problem is about scheduling a certain number of jobs on a single or parallel machines where all the jobs possess different processing times but a common due-date. The objective of the problem is to minimize the total penalty incurred due to earliness or tardiness of the job completions. ...

Journal: :J. Scheduling 2008
Philip Kaminsky Zu-Hsu Lee

We consider the sequencing of a series of jobs that arrive at a single processor over time. At each job’s arrival time, a due date must be quoted for the job, and the job must complete processing before its quoted due date. The objective is to minimize the sum (or average) of quoted due dates, or equivalently, the average quoted lead time. In this paper, we propose on-line heuristics for this p...

2007
Débora P. Ronconi Celso S. Sakuraba Francis Sourd

This paper addresses the minimization of the mean absolute deviation from a common due date in a two-machine flowshop scheduling problem. Initially, a job scheduling algorithm that obtains an optimal schedule for a given job sequence is presented. This algorithm is used with a job insertion procedure to generate a group of heuristics that differ on the initial job sequencing rule. Computational...

2015
Fitsum Getachew Eshetie Berhan

This paper presents a simulation and comparison analysis conducted to investigate the due-date assignment methods through various scheduling rules. The due date assignment methods investigated are flow time due date (FTDD) and total work content (TWK) method. Three scheduling rules are integrated in the simulation for scheduling of jobs on machines. The performance of the study is evaluated bas...

2008
Philip Kaminsky Onur Kaya

We consider a manufacturer, served by a single supplier, who has to quote due dates to arriving customers in a maketo-order production environment. The manufacturer is penalized for long lead times and for missing due dates. To meet due dates, the manufacturer has to obtain components from a supplier. We model this manufacturer and supplier as a two-machine flow shop, consider several variation...

2003
P. J. Sánchez D. Ferrin Oliver Rose

In semiconductor manufacturing facilities, there is often the need to speed up certain product types. This is usually done by either assigning higher priorities or by reducing due dates. In this paper, we study the effects of accelerating one product type by a tighter due date on the on-time delivery performance of the other products manufactured. It turns out that the results depend on the con...

Journal: :Oper. Res. Lett. 1997
S. T. Webster

Family scheduling problems are characterized by a setup time structure where setups are only required between jobs from different families. We consider the problem of scheduling job families on parallel machines to minimize weighted deviation about a common due date. Various special cases of this problem have been considered in the literature. This note summarizes known complexity results and i...

2011
Nikisha K. Shah Marianthi G. Ierapetritou

This paper presents a mathematical formulation for large-scale continuous process scheduling problem using unit-specific event-based continuous-time representation. The formulation is based on the work of Ierapetritou et al., (1999). The model considers the changeovers for multi-purpose units and tanks, setup constraints for parallel units and tanks, and includes product tanks that satisfy dema...

2008
Valery S. Gordon Alexander A. Tarasevich

In this paper we compare simulated annealing and tabu search approaches to a single machine common due date assignment and scheduling problem with jobs available at different times. The objective is to minimize the total weighted sum of earliness, tardiness and due date costs.