The operation of the SuperKEKB has been ongoing since 2016. vacuum systems main ring (MR) which consists a 7-GeV electron (HER) and 4-GeV positron (LER), damping (DR) for 1.1 GeV positrons in middle injector linac have working well as whole. As June 2022, maximum stored beam currents MR are 1.46 1.14 A LER HER, respectively, approximately 30 mA DR. pressure increase per unit current is steadily...