Abstract In this paper, a dynamic interaction model of the coupled system railway bridge, foundation, subsoil, ballast, track, and high-speed train is presented, with special emphasis on longitudinal between track bridge structure, taking into account flexibility ballast. After description system, equations motion are given separately for each subsystem. The discretization bedded rails performe...