نتایج جستجو برای: work hardening

تعداد نتایج: 955401  

One of the main issues involved during tunnel construction with tunnel boring machines is the tail gap grouting. This gap is between the external diameter of tunnel lining and the excavation boundary that is filled with high-pressure grouting materials. In this work, three different approaches of gap grouting modeling in the FLAC3D software are investigated with a special attention to the...

Journal: :Journal of the Japan Institute of Metals and Materials 1958

Journal: :Journal of the Japan Institute of Metals and Materials 1963

Journal: :Journal of the Japan Institute of Metals and Materials 1984

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید