In this study, granulated sludge synthesized in a sequence batch reactor (SBR) and then granulated sludge was transferred to continuous feeding and intermittent discharge (CFID) bioreactor. Two independent variables (air flow rate and hydraulic retention time (HRT)) were considered to optimize the process. Subsequently, long term performance (150 days) of the bioreactor was assessed by monitori...