There is a manufacturing system where several parts are processed through machining workstations and later assembled to form final products. In the event of disruptions such as machine failure, original flow-shop schedule needs be revised and/or rescheduled. scenario, rescheduling methods based on right-shift affected operations work very well. Here in this study, deviation make-span from used ...