Journal: :Discrete Applied Mathematics 1991
Philippe Chrétienne

The purpose of this paper is to study the latest schedule existence, calculation and properties of a basic cyclic scheduling problem with deadlines. First it is shown that, in the general case, a latest schedule exists but may be difficult to compute. Then we focus on a special case we call the optimal cyclic production problem. We derive an upper bound for the number of maximal-path values nee...

2015
R. K. Padhy S. Sahu

Identification and selection of Six Sigma projects are one of the most frequently discussed issues in the Six Sigma literatures today. In this paper a two-stage methodology has been proposed based on (i) Real Option Analysis for evaluating the value of the project to improve the managerial flexibility (ii) a zero–one integer linear programming model for selecting and scheduling an optimal proje...

2014
F. Villafañez A. Lopez-Paredes J. Pajares

In this paper we review different approaches for scheduling projects in multi-project environments. We show the evolution of the methodologies from the Resource Constrained Project Scheduling Problem to the Decentralized Resource Constrained Multi-Project Scheduling Problem. We argue that traditional methods used in project scheduling cannot cope with the complexity of current real portfolios p...

2006
DIETER DEBELS MARIO VANHOUCKE

Resource-constrained project scheduling with activity pre-emption assumes that activities are allowed to be interrupted and restarted later in the schedule at no extra cost. In the current paper, we extend this pre-emptive scheduling problem with setup times between activity interruptions and the possibility to fast track pre-emptive subparts of activities. The contribution of the paper is twof...

2012
ANCA ANDREICA CAMELIA CHIRA

Resource-constrained project scheduling is an NP-hard optimization problem focusing on the task of time-dependent resource allocation for a project. The current paper presents the application of a geometric collaborative evolutionary algorithm to this problem. Important features of the evolutionary model include population topology, asynchronous search and adaptive selection/recombination strat...

Journal: :Theoretical Economics 2018

2017
Pierre Bonnal Didier Gourc Germain Lacoste

Fuzzy project scheduling has interested several researchers in the past two decades; about 20 articles have been written on this issue. Contrary to stochastic project-scheduling approaches that are used by many project schedulers, and even if the axiomatic associated to the theory of probabilities is not always compatible with decision-making situations, fuzzy project-scheduling approaches that...

S. Danka,

This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cos...

Journal: :Games and Economic Behavior 2016

F hosseinzadeh lotfi M.A Shafiiee M.R Shahriyary

The time - cost tradeoff problem is one of the most critical issues in the project scheduling field and so far, a lot of research has been done with a variety of quantitative and qualitative approaches on this subject. In this research, we intend to provide a two - objective mathematical model which balances crash and delay for activities. So that it provides the right tools for decision makers...