نتایج جستجو برای: concrete face rockfill dam

تعداد نتایج: 250370  

Journal: :international journal of civil engineering 0
l. yanlong no.5, south jinhua road, xi’an, shanxi, china l. shouyi no.5, south jinhua road, xi’an, shanxi, china y. yang no.5, south jinhua road, xi’an, shanxi, china t. xing no.5, south jinhua road, xi’an, shanxi, china

this study simulates the temperature field and temperature stress of concrete face slabs, considering the cold waves that occur during construction as well as the contact friction between the face slabs and the cushion layer. the results show that when a cold wave occurs during construction, the surface and center temperature of the face slabs continually drop with the outside air temperature, ...

Concrete faced rockfill dams (CFRDs) are among the structures that due to their advantages such ease of construction and low execution costs,have attracted more attention nowadays.Due to the fact that during large earthquakes,the hydrodynamic pressure will be large and cannot be ignored,the main purpose of this research is to apply reservoir hydrodynamic pressure of dam reservoir caused by the ...

Journal: :Stroitel stvo nauka i obrazovanie [Construction Science and Education] 2019

Journal: :international journal of civil engineering 0
m.h. baziar sh. salemi t. heidari

seismic behavior of a rockfill dam with asphalt-concrete core has been studied utilizing numerical models with material parameters determined by laboratory tests. the case study selected for these analyses, is the meyjaran asphalt core dam, recently constructed in northern iran, with 60 m height and 180 m crest length. the numerical analyses have been performed using a nonlinear three dimension...

Journal: :Stroitel stvo nauka i obrazovanie [Construction Science and Education] 2019

Journal: :Frontiers in Earth Science 2023

During construction of concrete faced rockfill dam (CFRD), the extrusion-sidewall will be protruding or deficiency under normal. Before panel construction, local slope cutting should taken for squeezed side wall supplementary filling measures after excavating wall, which affect mechanical deformation panel. According to monitoring data concrete-faced dams some hydro-electric station in Hubei Pr...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید