نتایج جستجو برای: current state value stream mapping cvsm

تعداد نتایج: 2373209  

Journal: :Expert Syst. Appl. 2013
James C. Chen Chen-Huan Cheng Potsang B. Huang

This study applies lean production and radio frequency identification (RFID) technologies to improve the efficiency and effectiveness of supply chain management. In this study, a three-tier spare parts supply chain with inefficient transportation, storage and retrieval operations is investigated. Value Stream Mapping (VSM) is used to draw current state mapping and future state mapping (with lea...

2017
P. Vikraman Sanoop Kumar

Value stream mapping is a lean tool which is used in lean manufacturing to find the flow of information and material, as a product it makes way through value stream. These envision tool helps to understand processes by using of stream lined work process. In these paper value stream maps of a process by using simulation is developed. By creating dynamic value stream maps makes it possible to ana...

Journal: :Multidisciplinary Aspects of Production Engineering 2019

Journal: :3C Tecnología_Glosas de innovación aplicadas a la pyme 2019

Journal: :International journal of production management and engineering 2021

<p>This study aims to identify and reduce waste in PT Rajapaksi Adya Perkasa manufacturing company. The analysis uses the concept of green productivity with Green Value Stream Mapping as model. Through GVSM current state, this calculates amount production line including seven waste. result shows an improvement minimize that occurs through future state. technique increases value from 1.12 ...

2009
Jon H. Marvel Charles R. Standridge

A traditional lean transformation process does not validate the future state before implementation, relying instead on a series of iterations to modify the system until performance is satisfactory. An enhanced lean process that includes future state validation before implementation is presented. Simulation modeling and experimentation is proposed as the primary validation tool. Simulation model...

Journal: :Jurnal Teknik Industri 2022

Intisari— Blade Lift Cylinder D-8R merupakan salah satu komponen hidrolik alat berat. Dampak dari banyaknya remanufaktur terhadap blade lift cylinder ini menyebabkan leadtime pengiriman ke pelanggan menjadi lama. Hal akhirnya merugikan perusahaan dan juga secara tidak langsung. Kajian awal mengungkapkan bahwa disebabkan oleh jumlah pemborosan (waste) pada proses produksi cylinderD-8R. Adapun an...

Journal: :Jurnal Optimasi Sistem Industri 2019

2008
P. Kuhlang W. Sihn

A hybrid added value optimisation – specifically a combination of Value Stream Mapping (VSM) and Methods Time Measurement (MTM) – uses appropriate methods to raise added value. Both, in the use of MTM and the use of Value Stream Mapping, raising productivity is the center of all thought processes. Other targets are the reduction of lead time in Value Stream Mapping as well as the standardisatio...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید