نتایج جستجو برای: lerchs

تعداد نتایج: 16  

2013
W. B. Lambert A. M. Newman

n A common decision in openpit mining is to determine the extraction sequence of notional three-dimensional production blocks so as to maximize the net present value of the extracted orebody, while adhering to precedence and operational resource constraints. This openpit block sequencing (OPBS) problem is commonly formulated as an integer program, with binary variables representing if and when ...

2005
William D. May

The substitution method has proven to be an effective tool for bounding the critical probability of a variety of percolation models. Nevertheless, until recently substitution method calculations have been done by hand. This has severely restricted the size of computationally feasible substitution regions. We examine the computational problems posed by the substitution method, beginning with an ...

One of the main concerns of the mining industry is to determine ultimate pit limits. Final pit is a collection of blocks, which can be removed with maximum profit while following restrictions on the slope of the mine’s walls. The size, location and final shape of an open-pit are very important in designing the location of waste dumps, stockpiles, processing plants, access roads and other surfac...

Ultimate limits of an open pit, which define its size and shape at the end of the mine’s life, is the pit with the highest profit value. A number of algorithms such as floating or moving cone method, floating cone method II and the corrected forms of this method, the Korobov algorithm and the corrected form of this method, dynamic programming and the Lerchs and Grossmann algorithm based on grap...

Journal: :int. journal of mining & geo-engineering 2013
ali asghar khodayari

one of the main concerns of the mining industry is to determine ultimate pit limits. final pit is a collection of blocks, which can be removed with maximum profit while following restrictions on the slope of the mine’s walls. the size, location and final shape of an open-pit are very important in designing the location of waste dumps, stockpiles, processing plants, access roads and other surfac...

Journal: :journal of mining and environment 2012
ebrahim elahi reza kakaie amir yusefi

ultimate limits of an open pit, which define its size and shape at the end of the mine’s life, is the pit with the highest profit value. a number of algorithms such as floating or moving cone method, floating cone method ii and the corrected forms of this method, the korobov algorithm and the corrected form of this method, dynamic programming and the lerchs and grossmann algorithm based on grap...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید