نتایج جستجو برای: earliness

تعداد نتایج: 940  

Journal: :Annals OR 2003
J. Christopher Beck Philippe Refalo

A hybrid technique using constraint programming and linear programming is applied to the problem of scheduling with earliness and tardiness costs. The linear model maintains a set of relaxed optimal start times which are used to guide the constraint programming search heuristic. In addition, the constraint programming problem model employs the strong constraint propagation techniques responsibl...

Journal: :Systems 2023

This paper investigates single-machine scheduling with a deteriorating maintenance activity, where the processing time of job depends on whether it is handled before or after activity. Under common and slack due date assignments, aim to find optimal schedule, position value (flow-allowance) so that linear weighted sum earliness, tardiness minimized, weights are location-dependent (position-depe...

Journal: :Journal of the Korean Operations Research and Management Science Society 2013

Journal: :Journal of Agricultural Sciences, Belgrade 2006

Journal: :JORS 2010
Gur Mosheiov Jeffrey B. Sidney

We study a problem of scheduling a maintenance activity on a single machine. Following several recent papers, the maintenance is assumed to be deteriorating, that is, delaying the maintenance increases the time required to perform it. The following objective functions are considered: makespan, flowtime, maximum lateness, total earliness, tardiness and due-date cost, and number of tardy jobs. We...

2007
Pedro Castro Ignacio Grossmann Augusto Novais

This paper presents a new multiple-time grid, continuous-time mixed integer linear program (MILP) model for the short-term scheduling of single stage, multiproduct plants featuring equipment units with sequence dependent changeovers. It considers combined processing and changeover tasks as opposed to handling them separately and is very versatile in terms of type of objective function that can ...

2004
Gereon Müller

The goal of this paper is to outline the core of a new minimalist analysis of accusative vs. ergative patterns of argument encoding (via case marking or agreement). The central observation is that indeterminacies may arise in the application of the two elementary operations Merge and Agree (see Chomsky (2000, 2001)), given that they both obey an Earliness requirement (see Pesetsky (1989)); and ...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید