نتایج جستجو برای: generalized tardiness flowshop

تعداد نتایج: 167651  

2011
Jeremy P. Erickson James H. Anderson

Prior work has provided bounds on the deadline tardiness that a set of sporadic real-time tasks may incur when scheduled using the global earliest-deadline-first (G-EDF) scheduling algorithm. Under the sporadic task model, it is necessary that no individual task overutilize a single processor and that the set of all tasks does not overutilize the set of all processors. In this work we generaliz...

2003
Jorge M. S. Valente

The Apparent Tardiness Cost (ATC) heuristic is one of the best performing dispatch rules for the weighted tardiness scheduling problem. This heuristic uses a lookahead parameter whose value must be specified. In this paper we develop a function that maps some instance statistics into an appropriate value for the lookahead parameter. This function is compared with some fixed values that have bee...

2005
Shunji Tanaka Mituhiko Araki

The purpose of this study is to propose a new branch-and-bound algorithm for a class of scheduling problems to minimize total tardiness on identical parallel machines. In this algorithm, Lagrangian decomposition is applied to obtain better lower bounds. In addition, the job dominance conditions for the single machine tardiness problem are utilized for both restricting branches and improving the...

Journal: :J. Scheduling 2015
Sorina Dumitrescu George Steiner Rui Zhang

There are many situations when, due to unexpected delays, the supplier may not be able to deliver some orders by the promised due dates. We present a model for quoting attainable delivery times to minimize tardiness penalties and delivery costs, when deliveries take place in batches. We show that the general problem is strongly NPhard, but when all orders have the same per-unit due-dateassignme...

Journal: :Transactions of the Institute of Systems, Control and Information Engineers 1997

Journal: :Annals of Operations Research 2005

Journal: :Nigerian Journal of Technology 2015

Journal: :International Journal of Production Research 2023

We study a common due-date assignment problem on two parallel uniform machines. The jobs are assumed to have identical processing times, and job-dependent asymmetric earliness tardiness unit costs. scheduler may process only subset of the jobs, i.e. option job-rejection is allowed. objective function consists three cost components: total earliness-tardiness all scheduled due-date, rejection cos...

Journal: :بین المللی مهندسی صنایع و مدیریت تولید 0
ghasem moslehi professor of industrial engineering – isfahan university of technology kamran kianfar phd student of industrial engineering – isfahan university of technology

nowadays, scheduling problems have a considerable application in production and service systems. in this paper, we consider the scheduling of n jobs on a single machine assuming no machine idleness, non-preemptive jobs and equal process times. in many of previous researches, because of the delivery dalays and holding costs, earliness and tardiness penalties emerge in the form of linear combinat...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید