نتایج جستجو برای: machine shop

تعداد نتایج: 273072  

2014
Wojciech Bozejko Lukasz Gniewkowski Jaroslaw Pempera Mieczyslaw Wodecki

In this paper we consider an NP -hard hybrid flow shop problem with machine setups and cycletime minimization. The above issue is an important generalization of a flow-shop problem with minimization of a cycle time, and it stays in a direct relationship with a flexible job shop problem. In the hybrid problem task operations are performed by machines arranged in slots, i.e., a set of machines wi...

Journal: :Math. Meth. of OR 2003
Wolfgang Espelage Egon Wanke

We consider the movement minimization problem in a conveyor flow shop processing controlled by one worker for all machines. A machine can only execute tasks if the worker is present. Each machine can serve as a bu¤er. The objective is to minimize the total number of movements of the worker for the processing of all jobs. Such minimization problems usually appear in conveyor controlled manufactu...

2005
A. B. Chandramouli

This paper provides a new simple heuristic algorithm for a ‘3-Machine, njob’ flow-shop scheduling problem in which jobs are attached with weights to indicate their relative importance and the transportation time and break down intervals of machine are given. A heuristic approach method to find optimal or near optimal sequence minimizing the total weighted mean production flow time for the probl...

2007
Sergio Nicoletti Gaia Nicosia Andrea Pacifici

In this paper the Group Technology problem of grouping parts in families and machines in cells in order to convert a job shop production system to some pseudo ow shops is considered. Several heuristic methods for solving Group Technology problem have been proposed in the literature, in general, not producing a ow shop in each cell|unless a great number of extra machines is added. We use known t...

1998
Vadim G. Timkovsky VADIM G. TIMKOVSKY

This paper gives the positive answer to the question posed in the title for a wide class of minimization criteria including the maximum completion time, maximum lateness , total completion time, total weighted completion time, total tardiness, total weighted tardiness, number of late jobs and the weighted number of late jobs. That is any scheduling problem for m identical parallel machines to m...

2011
Angelo Oddi Riccardo Rasconi Amedeo Cesta Stephen F. Smith

This paper presents a meta-heuristic algorithm for solving a job shop scheduling problem involving both sequence dependent setup-times and the possibility of selecting alternative routes among the available machines. The proposed strategy is a variant of the Iterative Flattening Search (IFS) schema. This work provides three separate results: (1) a constraint-based solving procedure that extends...

Journal: :European Journal of Operational Research 2012
Sindhura Balireddi Nelson A. Uhan

We investigate cost-sharing mechanisms for scheduling cost-sharing games. We assume that the demand is general—that is, each player can be allocated one of several levels of service. We show how to design mechanisms for these games that are weakly group strategyproof, approximately budget-balanced, and approximately efficient, using approximation algorithms for the underlying scheduling problem...

2012
Zohreh Davarzani Nima Khairdoost

Flexible Job shop scheduling is very important in production management and combinatorial optimization. It is NP-hard problem and consists of two sub-problems: sequencing and assignment. Multiobjective Flexible Job-Shop Scheduling Problems (MFJSSP) is formulated as three-objective problem which minimizes completion time (makespan), critical machine workload and total work load of all machines. ...

Journal: :Operations Research 1997
M. Y. Wang S. P. Sethi Steef L. van de Velde

We study the problem of scheduling a chain-reentrant shop, a shop in which each job goes for its processing rst to a machine called the primary machine, then to a number of other machines in a xed sequence, and nally back to the primary machine for its last operation. The problem is to schedule the jobs so as to minimize the makespan. This problem is NP-hard in the strong sense for a general nu...