نتایج جستجو برای: piled raft foundation

تعداد نتایج: 97878  

Journal: :Transactions of the VŠB – Technical University of Ostrava, Civil Engineering Series. 2014

Journal: :Frontiers in Built Environment 2023

The setting of the late poured band is an effective measure to control differential settlement and stress concentration foundation. However, lag pouring time will also bring adverse effects construction process. Taking a large commercial complex as example, Midas GTS NX finite element software used for overall foundation modeling, collaborative calculation carried out by adjusting composite sch...

2016
Kuan-Hao Huang Hsuan-Tien Lin

We study the contextual bandit problem with linear payoff function. In the traditional contextual bandit problem, the algorithm iteratively chooses an action based on the observed context, and immediately receives a reward for the chosen action. Motivated by a practical need in many applications, we study the design of algorithms under the piled-reward setting, where the rewards are received as...

Journal: : 2023

Problem statement. The patented useful model for the design of combined raft-pile foundation (CRPF), consisting a raft part and piles, with gap height Δ is made between piles. That is, distribution settlements (resistances) soil base under then piles (after hinged connection raft) assumed, based on condition not exceeding maximum allowable settlement su building or structure. initial which aris...

Journal: :Advances in transdisciplinary engineering 2022

The upper structure of high piled wharf in coastal soft soil area is loaded by waves or ships, which transferred to the foundation through pile foundation. force small and lasts for a long time, causes strength saturated clay vibration range decrease slowly, weakening effect gradually accumulates, resulting horizontal displacement In this paper, maximum residual are deduced calculated analytica...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید