Journal: :Mathematical and Computer Modelling 2006
Gur Mosheiov Daniel Oron

In the scheduling problem addressed in this note we have to determine: (i) the job sequence, (ii) the (common) due-date, and (iii) the location of a rate modifying (maintenance) activity. Jobs scheduled before (after) the due-date are penalized according to their earliness (tardiness) value. The processing time of a job scheduled after the maintenance activity decreases by a job-dependent facto...

2008
H. Allaoui

This paper focuses on a stochastic scheduling problem in which n immediately available jobs are to be scheduled jointly with the preventive maintenance in a single machine subject to breakdowns. The objective is to minimize expected total earliness and tardiness costs with a common due-date. The problem of scheduling only n jobs to minimize total earliness and tardiness costs in a single machin...

2006
Jan Kelbel Zdeněk Hanzálek

The aim of this paper is to solve a problem on scheduling with earliness and tardiness costs using constraint programming approach, and to compare the results with the ones from the original timed automata approach. The case study, a production of lacquers, includes some real life features like operating hours or changeover times. Considering the earliness and tardiness costs of the case study,...

Journal: :پژوهش های حبوبات ایران 0
علی گنجعلی حسن پرسا عبدالرضا باقری

earliness and drought escape are as a primary strategy for plant adaptation in regions that plants are subjected to terminal drought stress. plants react to drought through morphological changes and alteration in physiological behavior. accordingly, two separate experiments to assess the response of yield and morphophysiological characteristics of earliness chickpea genotypes to drought stress ...

2017
S. E. Jayanthi

A novel algorithm for one machine scheduling to minimize total weighted earliness and tardiness using particle swarm optimization is proposed. Existing techniques face challenges such as job size limitations increase in computational time and inaccurate solutions. To overcome these challenges the proposed work implements Meta-Heuristic based particle swarm optimization to optimize the total wei...

1999
MAGED DESSOUKY BRIAN KIJOWSKI SUSHIL VERMA

We consider the problem of determining the allocation of demand from different customer orders to production batches and the schedule of resulting batches to minimize the total weighted earliness and tardiness penalties in context of batch chemical processing. The problem is formulated as a mixed-integer nonlinear programming model. An iterative heuristic procedure that makes use of the network...

2011
Sunita Gupta

Single machine, distinct due dates, early/lately machine problem and fuzzy environment closely models the situation faced by ‘Just In Time’ manufacturing. The objective of this paper is to sequence the jobs on the machine, so that the total penalty cost be minimum. This cost is composed of the total earliness and the total tardiness cost. An algorithm is developed here to minimize the total pen...

Journal: :JORS 2002
R.-H. Huang C.-L. Yang H.-T. Huang

In this paper, we consider a machine scheduling problem where jobs should be completed at times as close as possible to their respective due dates, and hence both earliness and tardiness should be penalized. Specifically, we consider the problem with a set of independent jobs to be processed on several identical parallel machines. All the jobs have a given common due window. If a job is complet...

2013
Georgios I. Zervakis Georgios Koutrotsios Panagiotis Katsaris

Two-phase olive mill waste (TPOMW, "alperujo") is a highly biotoxic sludge-like effluent of the olive-oil milling process with a huge seasonal production. One of the treatment approaches that has so far received little attention is the use of TPOMW as substrate for the cultivation of edible mushrooms. Fifteen fungal strains belonging to five species (Basidiomycota), that is, Agrocybe cylindrace...

2013
N. Manavizadeh A. Dehghani M. Rabbani

Mixed model assembly lines (MMAL) are a type of production line where a variety of product models similar in product characteristics are assembled. The effective design of these lines requires that schedule for assembling the different products is determined. In this paper we tried to fit the sequencing problem with the main characteristics of make to order (MTO) environment. The problem solved...