نتایج جستجو برای: hydro thermal self scheduling htss

تعداد نتایج: 813833  

2012
Nand Kishore Amita Mahor

Generation scheduling is a most important task in the operation and planning of power system. It can be on real term, short term, medium term, and long term basis as per the scheduled horizon. Scheduling of purely hydroelectric system differ from the thermal scheduling and hydrothermal scheduling problems in two aspects firstly fuel cost for the thermal part of the system can no longer be used ...

Journal: :Hydro Nepal: Journal of Water, Energy and Environment 2012

Journal: :IEEJ Transactions on Power and Energy 2002

2011
G. E. MORA CÁRDENAS G. PÉREZ-LECHUGA J. C. SECK-TUOH-MORA

In this document we develop a non-linear, stochastic and integer model for the problem of determining the optimal hourly schedule of power generation in a hydrothermal power system. We consider a power generation system comprising thermal and hydro units and the problem concerns the scheduling of operation levels for all power units and considering the hydro constrains, such that the operation ...

2015
C. Jena M. Basu

Artificial Immune System is applied to determine the optimal hourly schedule of power generation in a hydrothermal system. A multi-reservoir cascaded hydroelectric system with a nonlinear relationship between water discharge rate, net head and power generation is considered. The water transport delay between connected reservoirs is taken into account. The transmission losses are also taken into...

Journal: :European Journal of Operational Research 2012
Andrew B. Philpott Vitor L. de Matos

We consider the incorporation of a time-consistent coherent risk measure into a multi-stage stochastic programming model, so that the model can be solved using a SDDP-type algorithm. We describe the implementation of this algorithm, and study the solutions it gives for an application of hydro-thermal scheduling in the New Zealand electricity system. The performance of policies using this risk m...

Journal: :European Journal of Operational Research 2016
Timo Lohmann Amanda S. Hering Steffen Rebennack

Hydro-thermal scheduling is the problem of finding an optimal dispatch of power plants in a system containing both hydro and thermal plants. Since hydro plants are able to store water over long time periods, and since future inflows are uncertain due to precipitation, the resulting multi-stage stochastic optimization problem becomes challenging to solve. Several solution methods have been devel...

2013
Perica Ilak Slavko Krajcar Ivan Rajšl Marko Delimar

Water is scarce resource with uncertain availability. Hence finding an optimal production schedule for hydro producer is usually a complex task and it is necessary to carefully balance the timing of water use. This paper addresses the selfscheduling problem for a price-taker hydro producer. The goal is maximizing the profit of a hydro producer through participating in the day-ahead energy and a...

Journal: :European Journal of Operational Research 2015
Ricardo M. Lima Augusto Q. Novais Antonio J. Conejo

This paper addresses the optimization under uncertainty of the self-scheduling, forward contracting, and pool involvement of an electricity producer operating a mixed power generation station, which combines thermal, hydro and wind sources, and uses a two stage adaptive robust optimization approach. In this problem the wind power production and the electricity pool price are considered to be un...