This paper presents an efficient heuristic method to minimize total flow time in no-wait flow shop scheduling. It is based on the assumption that the priority of a job in the initial sequence is given by the sum of its processing times on the bottleneck machines. Empirical results demonstrate the superiority of the proposed method over the best-known heuristics in the literature, while remainin...
The No-Wait Job Shop (NWJS) considered here is a version of the job shop scheduling problem where, for any two operations of a job, a fixed time lag between their starting times is given. Also, sequence-dependent set-up times between consecutive operations on a machine can be present. The NWJS problem consists in finding a schedule that minimizes the makespan. We address here the so-called Opti...
Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...
The m-machine no-wait flowshop scheduling problem is addressed where setup times are treated as separate from processing times. The objective is to minimize total tardiness. Different dispatching rules have been investigated and three were found to be superior. Two heuristics, a simulated annealing (SA) and a genetic algorithm (GA), have been proposed by using the best performing dispatching ru...
In this work we study a flowshop scheduling problem in which jobs are not allowed to wait in-between machines, a situation commonly referred to as no-wait. The concerned criterion is to minimize a weighted sum of makespan and maximum lateness. A dominance relation for the case of three-machine is presented and evaluated by experimental designs. Several heuristics and local search methods are pr...
This paper explains minimization of makespan or total completion time for n-jobs, m-machine, no-wait flowshop problem (NW-FSSP). A spread sheet based general purpose genetic algorithm is proposed for the NW-FSSP. The example analysis shows that the proposed approach produces results are comparable to the previous approaches cited in the literature. Additionally, it is demonstrated that the curr...
In shop scheduling, several applications exist where it is required that some components perform consecutively. We refer to no-idle schedules if machines are required to operate with no inserted idle time and no-wait schedules if tasks cannot wait between the end of an operation and the start of the following one. We consider here no-idle/no-wait shop scheduling problems with makespan as perfor...
Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...
Abstract. In a no-wait robotic flow-shop, the parts are transferred from a machine to another one by a robot and the time a part can remain on a machine is fixed. The objective is to maximize the throughput rate of the cell, i.e. to find optimal cyclic robot moves. In this paper, we consider identical parts in the balanced case (all processing times are equal). We present a conjecture which giv...