Based on current researches and developments of open-pit mine slope in China, the engineering features of open-pit mine slopes are summarized. Mine slope is basically formed by dynamic excavation of multi-level and multi-type, and mining benefit is the purpose of mine slope engineering when using various schemes and/or methods. Thus, the issues of design and stability analyses are the main conc...
This paper proposes a new mathematical model for the open pit mine planning problem, based on continuous functional analysis. The traditional models for this problem have been constructed by using discrete 0−1 decision variables, giving rise to large-scale combinatorial and Mixed Integer Programming (MIP) problems. Instead, we use a continuous approach which allows for a refined imposition of s...
Conventional open pit mine optimization models for designing mining phases and ultimate pit limit do not consider expected variations and uncertainty in metal content available in a mineral deposit (supply) and commodity prices (market demand). Unlike the conventional approach, a stochastic framework relies on multiple realizations of the input data so as to account for uncertainty in metal con...
Open-pit mining is one of the main exploiting methods for solid mineral resources. After more than 100 years high-intensity development, there are a large number abandoned open-pit mines and related relics in world. The reconstruction Pumped Hydraulic Energy Storage systems (PHES) from an effective utilization mode underground space recent years. project planning PHES should consider not only t...
We present a methodology for long-term mine planning based on a general capacitated multicommodity network flow formulation. It considers underground and open-pit ore deposits sharing multiple downstream processing plants over a long horizon. The purpose of the model is to optimize several mines in an integrated fashion, but real size instances are hard to solve due to the combinatorial nature ...
Slope stability is one of the most important issues in open pit mining design. The main purpose of any open pit mine design is to propose an optimal excavation configuration, considering safety, ore recovery and financial return. An accurate pit slope design which accounts for the mine geology, structural geology, rock mass properties, and hydrogeology models of the mine area, drastically enhan...
Truck and shovel operations comprise approximately 60% of the total operating costs in open pit mines. In order to increase productivity and reduce the cost of mining operations, it is essential to manage the equipment used with high efficiency. In this work, the chance-constrained goal programing (CCGP) model presented by Michalakopoulos and Panagiotou is developed to determine an optimal truc...
This paper proposes a newmathematical framework for the open pit mine planning problem, based on continuous functional analysis. The main challenge for engineers is to determine a sequence of nested profiles maximizing the net present value of the mining operation. The traditional models for this problem have been constructed by using binary decision variables, giving rise to large-scale combin...
For the purpose of production scheduling, open-pit mines are discretized into three-dimensional arrays known as block models. Production scheduling consists of deciding which blocks should be extracted, when they should be extracted, and what to do with the blocks once they are extracted. Blocks that are close to the surface should be extracted first, and capacity constraints limit the producti...