Journal: :international journal of industrial engineering and productional research- 0
r. tavakolimoghadam m. vasei

in this paper, a single machine sequencing problem is considered in order to find the sequence of jobs minimizing the sum of the maximum earliness and tardiness with idle times (n/1/i/etmax). due to the time complexity function, this sequencing problem belongs to a class of np-hard ones. thus, a special design of a simulated annealing (sa) method is applied to solve such a hard problem. to comp...

Journal: :Mathematical and Computer Modelling 2006
Gur Mosheiov Daniel Oron

In the scheduling problem addressed in this note we have to determine: (i) the job sequence, (ii) the (common) due-date, and (iii) the location of a rate modifying (maintenance) activity. Jobs scheduled before (after) the due-date are penalized according to their earliness (tardiness) value. The processing time of a job scheduled after the maintenance activity decreases by a job-dependent facto...

2006
Jan Kelbel Zdeněk Hanzálek

The aim of this paper is to solve a problem on scheduling with earliness and tardiness costs using constraint programming approach, and to compare the results with the ones from the original timed automata approach. The case study, a production of lacquers, includes some real life features like operating hours or changeover times. Considering the earliness and tardiness costs of the case study,...

2008
H. Allaoui

This paper focuses on a stochastic scheduling problem in which n immediately available jobs are to be scheduled jointly with the preventive maintenance in a single machine subject to breakdowns. The objective is to minimize expected total earliness and tardiness costs with a common due-date. The problem of scheduling only n jobs to minimize total earliness and tardiness costs in a single machin...

2017
S. E. Jayanthi

A novel algorithm for one machine scheduling to minimize total weighted earliness and tardiness using particle swarm optimization is proposed. Existing techniques face challenges such as job size limitations increase in computational time and inaccurate solutions. To overcome these challenges the proposed work implements Meta-Heuristic based particle swarm optimization to optimize the total wei...

1999
MAGED DESSOUKY BRIAN KIJOWSKI SUSHIL VERMA

We consider the problem of determining the allocation of demand from different customer orders to production batches and the schedule of resulting batches to minimize the total weighted earliness and tardiness penalties in context of batch chemical processing. The problem is formulated as a mixed-integer nonlinear programming model. An iterative heuristic procedure that makes use of the network...

Journal: :Computers & Industrial Engineering 2006
Jorge M. S. Valente

In this paper, we present dominance conditions for the single machine weighted earliness scheduling problem with no idle time. We also propose an algorithm that can be used to improve upper bounds for the weighted earliness criterion and lower bounds for an earliness/tardiness problem. The computational tests show that the algorithm is superior to an initial heuristic schedule and an existing a...

Journal: :Journal of Industrial and Management Optimization 2023

This paper investigates the single-machine due-window assignment scheduling with truncated learning effects and past-sequence-dependent setup times simultaneously. The scheduler has option of job-rejection, i.e., some jobs are processed other rejected. Under three (i.e., common, slack different) methods, our goal is to minimize sum a general earliness-tardiness cost weighted earliness-tardiness...