Lead time is one of the major limits that affect planning at every stage of the supply chain system. In this paper, we study a continuous review inventory model. This paper investigates the ordering cost reductions are dependent on lead time. This study addressed two-echelon supply chain problem consisting of a single vendor and a single buyer. The main contribution of this study is that the in...
The purpose of this problem is to choose a set of project activities for crashing, in a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this pap...
Integrated Supply Chain for a Single Vendor and Multiple Buyers and Products with Crashing Lead Time
Crashing stochastic activities implies changing their distributions to reduce the mean. This can involve changing the variance too. Therefore, crashing can change not only the expected duration of a project but also the necessary size of its safety buffer. We consider optimal crashing of serial projects where the objective is to minimize total costs including crashing cost and expected delay pe...
with the aim of reducing cost of electricity consumption and peak load reduction, tools requirement for better managing electricity consumption have become inevitable in recent years. smart home has some equipment which are controllable and this ability is used for increasing comfort and minimizing electricity cost for residence. as a key component of smart home , electric vehicle(ev) ,increase...
Faster completion of projects continues to be an important problem in project management. The traditional approach to reduce completion time has been to shorten the time required for performing a particular activity, often called crashing. In this paper, we propose the addition of two related approaches to expedite a project: increasing the parallel processing of tasks by completely removing pr...
We describe robust optimization procedures for controlling total completion time penalty plus crashing cost in projects with uncertain activity times. These activity times arise from an unspecified distribution within a family of distributions with known support, mean and covariance. We develop linear and linear-based decision rules for making decisions about activity start times and the crashi...