نتایج جستجو برای: total earliness and tardiness

تعداد نتایج: 16875967  

2013
N. Manavizadeh A. Dehghani M. Rabbani

Mixed model assembly lines (MMAL) are a type of production line where a variety of product models similar in product characteristics are assembled. The effective design of these lines requires that schedule for assembling the different products is determined. In this paper we tried to fit the sequencing problem with the main characteristics of make to order (MTO) environment. The problem solved...

Journal: :Eng. Appl. of AI 2010
Safa Khalouli Fatima Ghedjati Abdelaziz Hamzaoui

In this paper we address a hybrid flow shop scheduling problem considering the minimization of the sum of the total earliness and tardiness penalties. This problem is proven to be NP-hard, and consequently the development of heuristic and meta-heuristic approaches to solve it is well justified. So, we propose an ant colony optimization method to deal with this problem. Our proposed method has s...

Journal: :International Journal of Production Research 2021

We consider a special class of resource-constrained single machine scheduling problems. In the classical context, resource types are classified into renewable and non-renewable; however, large variety real-world problems may not fit one these classes, e.g. labour regulations in project scheduling, budget allocation to different phases construction project, dose management medical imaging centre...

2014
Long Wan

We investigate a common due-date assignment scheduling problem with a variable maintenance on a single machine. The goal is to minimize the total earliness, tardiness, and due-date cost. We derive some properties on an optimal solution for our problem. For a special case with identical jobs we propose an optimal polynomial time algorithm followed by a numerical example.

2006
Andreas C. Nearchou

A new meta-heuristic for scheduling multiple jobs on a single machine so that they are completed by a common specified date (neither earlier, nor later) is addressed in this paper. Costs are set depending on whether a job finished before (earliness), or after (tardiness) the specified due date. The objective is to minimize the total weighted earliness and tardiness penalized costs from the spec...

2008
Valery S. Gordon Alexander A. Tarasevich

In this paper we compare simulated annealing and tabu search approaches to a single machine common due date assignment and scheduling problem with jobs available at different times. The objective is to minimize the total weighted sum of earliness, tardiness and due date costs.

Journal: :Computers & Industrial Engineering 2015
Hui Zhu Min Li Zhangjin Zhou

In this paper we investigate scheduling problems with a deteriorating and resource-dependent maintenance activity on a single machine. The duration of the maintenance is assumed to be dependent both on its starting time and on the resource allocated to it. The objective is determining the job sequence, the position to perform a maintenance activity and the amount of additional resource allocate...

Journal: :Computers & Industrial Engineering 2006
Jorge M. S. Valente

In this paper, we present dominance conditions for the single machine weighted earliness scheduling problem with no idle time. We also propose an algorithm that can be used to improve upper bounds for the weighted earliness criterion and lower bounds for an earliness/tardiness problem. The computational tests show that the algorithm is superior to an initial heuristic schedule and an existing a...